Laserfiche WebLink
• <br />• <br />• <br />25 <br />2. Resource inventory; <br />3. Preliminary plat; <br />4. Preliminary grading, drainage and erosion control plan; <br />5. Preliminary utility plan; <br />6. Wetland mitigation plan (if determined necessary); <br />7. Yield plan (if determined necessary); and <br />8. Preliminary landscaping plan Environmental evaluations (if determined necessary); <br />(b) NOTE: One /two additional large scale copies shall be provided for each of the following, if <br />applicable: additional sets of information shall be provided for each of the following, if applicable: <br />1. Project is adjacent to a county road or county state aid highway (1 extra set); <br />2. Project is adjacent to a state highway or interstate highway (2 extras sets); and <br />3. Project lies within a Shoreland District (1 extra set). <br />(3) Certificate of survey. PThe certificate of survey shall be prepared and signed by a licensed land <br />surveyor and shall include identifying the following information: <br />(a) Scale (engineering only) at not larger than 1 inch equals 100 feet; <br />(b) North point indication; <br />(c) Existing parcel boundaries to be platted with dimensions and area; <br />(d) Existing legal description; <br />(e) Easements of record; <br />(f) Delineated wetland boundary, to include the ordinary high water level (OHWL) of any lakes <br />or Department of Natural Resources (DNR) waters; flood plain as shown on Federal Emergency <br />Management Agency (FEMA) FIRM map; <br />(g) All encroachments; <br />(h) Existing buildings, structures, and improvements within the parcel to be platted and those 100 <br />feet outside the boundaries of the subject parcel; <br />DRAFT JANUARY 26, 2009 <br />