My WebLink
|
Help
|
About
|
Sign Out
Home
Search
Comprehensive Annual Financial Report 12/31/2008
LinoLakes
>
Finance
>
Annual Financial Statements
>
Comprehensive Annual Financial Report 12/31/2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2014 2:22:49 PM
Creation date
5/20/2014 1:14:43 PM
Metadata
Fields
Template:
Finance Dept
Finance Category
Publications & Reports
Finance Document Folder
Annual Financial Reports
Finance Number Identifier
Comprehensive Annual Financial Report
Date
12/31/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A 12,582 square foot building was built by Schwan's in the Marshan Industrial Park on the southwest quadrant of <br />I -35W and Lake Drive was completed in 2005, further contributing jobs and adding value to the city's growing <br />commercial /industrial tax base. Construction of a two -story office building at the intersection of Lake Drive and <br />Hodgson Road was completed in 2006 and will house E.G. Rud Surveyors and several other tenants. <br />The City initiated an Alternative Urban Areawide Review (AUAR) of property in excess of 4,000 acres in the <br />northeast quadrant of the city, which includes property in the I -35E corridor, to assess the impact of future <br />development scenarios in this area. The AUAR was completed and accepted by the City Council in October, <br />2005. The AUAR included the proposed Hardwood Creek development, a 360 acre master - planned mixed -use <br />development. If initiated, the development would include approximately 1,100 dwelling units and 600,000 square <br />feet of commercial /retail buildings and preserve 90 acres of green space. <br />Building activity and development continued to soften during 2008 reflecting the broader market trends nation- <br />` wide and the onset of an economic recession in December, 2007. Building permits for new homes in 2008 <br />numbered 29, about 1/3 of 2007 and down by over 85% from 2005. <br />Long -term financial planning. In 2004, the City entered into an agreement with Hartford Development LL, <br />LLC, to develop 40 acres in the southeast quadrant of I -35W and Lake Drive. This mixed -use development was <br />scheduled to occur over a period of two to five years and include up to 450 dwelling units, retail commercial <br />business, a community green and park and trail amenities and a 60 -unit motel. With development at a virtual <br />standstill due to the recession and the collapse of the real estate market, the property was foreclosed by the <br />mortgage banks in early 2008. The banks continue to market the property to prospective developers. <br />Country Inn and Suites was completed and opened in November, 2006 and still operating amid the economic <br />distress. The YMCA, in partnership with the City, also opened its facility within the development in July, 2007, <br />and is doing very well with membership on the rise. The City's participation in the YMCA is $2.35 million of the <br />$8.2 million project, plus land and infrastructure. The City has issued G.O. Tax Abatement bonds to finance its <br />contribution to this project, as well as $4.0 million in conduit debt. The City has also secured a CDBG grant of <br />$125,000 to be used toward a teen center within the YMCA. Anoka County is planning to locate a branch library <br />in close proximity to the development as well, with construction scheduled to start in 2010. <br />_ Street, streetscape, water, sewer, and storm water improvements have been installed within the development area <br />and assessed to the development. Improvements to the existing Lake Drive and the construction of a new <br />interchange at Interstate 35W and Lake Drive were substantially completed in October, 2008. The cost of this <br />improvement is approximately $11.1 million is financed through the joint efforts of MNDOT, Anoka County and <br />— <br />the City of Lino Lakes. The City has issued $4,215,000 in G.O. Tax Increment bonds and will use tax increment <br />financing and Minnesota State Aid funds to finance its portion of the project cost. It is acknowledged that this <br />development will result in additional ongoing costs involved in servicing and maintaining the streets and public <br />areas, which will be addressed in future operating budgets. <br />The City's current five -year financial plan, adopted in January, 2008, identifies street and utility improvements <br />totaling $23,287,990 over the period of 2008 through 2012. These improvements are anticipated to be funded <br />through a number of funding sources, including special assessments, municipal state aid road funds, the area and <br />unit trunk fund, the stormwater management fund and voter - approved tax levies. Also included in the final year <br />Immo of the plan is a feasibility study for a new public works facility. Scheduled capital equipment and office <br />equipment needs and the financing for those needs are also included in the plan. The five -year plan also includes <br />funding projections for operations and operating impacts for the period of 2008 -2012. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.