My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/01/2009 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2009
>
06/01/2009 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2014 3:13:32 PM
Creation date
5/22/2014 9:29:03 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/01/2009
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Rice Creek Watershed District will require some stormwater management <br />practices near wetlands along Pine Street. The project will also require coordination <br />of two culverts along Pine Street that are under Rice Creek Watershed District <br />jurisdiction. <br />The total project cost from Lake Drive to the west end of Pine Street is estimated to <br />be $685,000. To pave from Lake Drive to 4th Avenue the cost is estimated to be <br />$390,000. The costs of this project will be split 50% - 50% between the City of Lino <br />Lakes and the City of Columbus. The cost estimates include construction, <br />contingencies, administiation, engineering and legal. <br />With the costs split, the Lino Lakes portions of the estimate for paving Lake Drive to <br />the west end of Pine Street would be $342,500 ($685,000 /2) giving a pending <br />assessment cost for each of the 36 properties of approximately $9,515. The Lino <br />Lakes portion of the estimate of paving Lake Drive to 4th Avenue is $195,000 <br />($390,000 /2) giving a pending assessment cost for each of the 21 properties of <br />approximately $9,285. <br />a) City of Columbus <br />At the May 4, 2009 Lino Lakes Work Session a statement was made that the City <br />of Columbus has approved this project and is ready to move forward in the <br />process and that the estimated cost per resident is approximately $7,000. The <br />City of Columbus was contacted to verify the status of this project and they have <br />stated that they are awaiting any Lino Lakes actions. They have subsequently <br />authorized their engineer to work with Lino Lakes on updating construction costs. <br />The estimated cost of $7,000 per Columbus resident is a figure developed from <br />the 2004 estimated costs. <br />4) Schedule: <br />ORDER FEASIBILITY STUDY JUNE 2009 <br />ACCEPT FEASIBILITY STUDY AND CALL PUBLIC HEARING JULY 2009 <br />• Notice of hearing shall be published twice, at least one week apart, in the official <br />newspaper of the City no less than two weeks prior to the date of hearing, and <br />• A copy of the hearing, including estimated unit prices and the estimated total <br />price, shall be mailed to each benefited property owner at least two weeks prior <br />to the date of the hearing. <br />PUBLIC HEARING AUGUST 2009 <br />PE'1'1'11ONING PROCESS <br />• Within 60 days after close of public hearing, the following petitions can be filed: <br />(August 2009 to October 2009 = 60 Days) <br />— A petition against improvement by either majority of property owners <br />proposed to be assessed or if initiated by (l a) at least equal to number <br />2 <br />• <br />• <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.