Laserfiche WebLink
I <br />I. Introduction <br />As ordered by the Lino Lakes City Council on April 27, 2009, a Feasibility Study <br />has been prepared for State Project (SP) 02- 614 -28, CSAH 14 & I -35E <br />interchange project. <br />The proposed project consists of total reconstruction of the existing interchange <br />which is located at the intersection of Interstate 35E (I -35E) and County State Aid <br />Highway (CSAH) 14 in Anoka County. The project also includes the widening of <br />CSAH 14 from two lanes to four and six lanes as well as replacement of the <br />existing CSAH 14 bridge over I -35E, Bridge #020803. See Figure 1 for project <br />location. <br />The proposed reconstruction of the CSAH 14 & I -35E interchange is a <br />subsequent phase of the proposed improvements along CSAH 14. Anoka <br />County is currently upgrading CSAH 14 to a four lane divided facility from I -35W <br />to CSAH 54. Washington County recently upgraded CSAH 14 /CSAH 8 to a four <br />lane divided facility from just east of I -35E to TH 61. The CSAH 14 & I -35E <br />interchange will provide the needed link and complete the improvements in this <br />area. <br />The purpose of this report is to document the improvements as well as the <br />estimated costs proposed under this project and provide a recommendation <br />regarding the feasibility of the project to move forward and be partially funded by <br />the City of Lino Lakes and its property assessments. Appendix A contains a <br />detailed summary of the Feasibility Study process timeline. <br />II. Summary and Recommendations <br />The proposed CSAH 14 & I -35E interchange reconstruction project, SP 02 -614- <br />28, as outlined herein, is necessary, cost - effective, and feasible from an <br />engineering standpoint and conforms to the City of Lino Lakes Comprehensive <br />Plans. <br />A detailed description of the needs is included in Section 111 of this report. <br />The total cost of the project is estimated to be $23,025,000. A detailed <br />construction cost estimate is included in Appendix A of this report. <br />CSAH 14 & I -35E Interchange Project <br />Feasibility Study <br />July 2009 <br />Page 1 <br />