My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/06/2009 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2009
>
07/06/2009 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2014 5:34:29 PM
Creation date
5/22/2014 1:26:49 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/06/2009
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Costs were allocated to the appropriate parcel based on future land use <br />projections contained in the City of Lino Lakes 2008 Comprehensive Plan. Land <br />use types and sizes were estimated using the I -35E Corridor AUAR for the <br />respective area. The land uses identified were generalized into four categories: <br />Commercial, Industrial, Mixed -Use and Institutional. Existing uses were taken <br />into account that fall within the affected area. A cost per square foot value was <br />determined for each respective land use type based on the impact these <br />potential land uses have or will have on the adjacent roadway network, resulting <br />in the need for the proposed interchange improvement. A real estate appraisal <br />firm was engaged to confirm the assessment methodology and to review the <br />proposed special assessment amounts for the properties based on their potential <br />for market value increases resulting from the project. Lake State Realty <br />Services, Inc. reviewed the property assessment values and confirmed their <br />validity. <br />Furthermore, the parcels were prorated based on their potential to develop due <br />to City utility staging plans. The City of Lino Lakes has identified when City <br />services will be eligible for extension into areas for future development (see <br />Figure 6 - Utility Staging Map). This will impact the ability of these areas to <br />develop, and as such may impact value. Therefore, parcels located closer to the <br />proposed improvement and provided with utility service sooner will have more <br />value and pay a higher portion of assessment. <br />VIII. Project Funding Sources <br />The total cost of the project is estimated to be $23,025,000. Funding sources for <br />this project include the following: <br />• Surface Transportation Program (STP): $5,775,000 <br />• Federal High Priority Project funds (HPP): $980,000 <br />• American Recovery and Reinvestment Act funds (ARRA): $4,800,000 <br />• Mn /DOT (In- Construction Services): $1,200,000 <br />• Local (Anoka County /City of Lino Lakes): $10,270,000 <br />o The City of Lino Lakes is proposing to assess $5,506,415 of their <br />contribution to property owners in the immediate vicinity <br />A detailed preliminary construction cost estimate is included in Appendix A of this <br />report. <br />CSAH 14 & I -35E Interchange Project <br />Feasibility Study <br />July 2009 <br />Page 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.