My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/06/2009 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2009
>
07/06/2009 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2014 5:34:29 PM
Creation date
5/22/2014 1:26:49 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/06/2009
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H: \PROJECTS \6509 \H I -MU \ EXCEL\ ESTIMATE \6509_SEQ_printable.xls.xls <br />SRF NO. 0086509 <br />By: <br />Checked: <br />ENGINEER'S ESTIMATE <br />C.S.A.H. 14135E INTERCHANGE <br />By: SRF CONSULTING GROUP, Inc. <br />ITEM NO. <br />ITEM DESCRIPTION <br />UNIT <br />TOTAL PROJECT <br />QUANTITIES <br />I ESTIMATED <br />UNIT <br />COST <br />ESTIMATED <br />TOTAL <br />AMOUNT <br />ESTIMATED <br />2582.502 <br />4" SOLID LINE WHITE -EPDXY <br />LIN FT <br />39280 <br />$0.40 <br />$15,712.00 <br />2582.502 <br />8" SOLID LINE WHITE -EPDXY <br />LIN FT <br />1240 <br />$0.40 <br />$496.00 <br />2582.502 <br />24" SOLID LINE WHITE -EPDXY <br />LIN FT <br />60 <br />$5.00 <br />$300.00 <br />2582.502 <br />4" BROKEN LINE WHITE -EPDXY <br />LIN FT <br />1740 <br />$0.40 <br />$696.00 <br />2582.502 <br />8" DOTTED LINE WHITE -EPDXY <br />LIN FT <br />250 <br />$1.50 <br />$375.00 <br />2582.502 <br />4 " SOLID LINE YELLOW -EPDXY <br />LIN FT <br />32720 <br />$0.40 <br />$13,088.00 <br />2582.502 <br />24" SOLID LINE YELLOW -EPDXY <br />LIN FT <br />210 <br />$5.00 <br />$1,050.00 <br />2582.503 <br />CROSSWALK MARKING - PREFORMED THERMOPLASTIC <br />SQ FT <br />1890 <br />$6.00 <br />$11,340.00 <br />2104.601 <br />REMOVE REGULATED WASTE MATERIAL (BRIDGE) <br />LUMP SUM <br />1 <br />$10,000.00 <br />$10,000.00 <br />2301.553 <br />BRIDGE APPROACH PANELS (P) <br />SQ YD <br />482 <br />$110.00 <br />$53,020.00 <br />2401.501 <br />STRUCTURAL CONCRETE (1A43) (P) <br />CU YD <br />474 <br />$400.00 <br />$189,600.00 <br />2401.501 <br />STRUCTURAL CONCRETE (3Y43) (P) <br />CU YD <br />635 <br />$500.00 <br />$317,500.00 <br />2401.512 <br />BRIDGE SLAB CONCRETE (3Y36) (P) <br />SQ FT <br />29162 <br />$15.00 <br />$437,430.00 <br />2401.513 <br />TYPE MOD F (TL -4) RAILING CONCRETE (3Y46) (P) <br />LIN FT <br />291 <br />$70.00 <br />$20,370.00 <br />2401.513 <br />TYPE MOD P -1 (TL -2) RAILING CONC (3Y46) (P) <br />LIN FT <br />291 <br />$75.00 <br />$21,825.00 <br />2401.513 <br />TYPE P -4 (TL -4) RAILING CONCRETE (3Y46) (P) <br />LIN FT <br />291 <br />$60.00 <br />$17,460.00 <br />2401.516 <br />RAISED MEDIAN CONCRETE (3Y46) (P) <br />SQ FT <br />2029 <br />$7.00 <br />$14,203.00 <br />2401.541 <br />REINFORCEMENT BARS (P) <br />POUND <br />42700 <br />$1.40 <br />$59,780.00 <br />2401.541 <br />REINFORCEMENT BARS (EPDXY COATED) (P) <br />POUND <br />274190 <br />$1.50 <br />$411,285.00 <br />2401.601 <br />STRUCTURE EXCAVATION <br />LUMP SUM <br />1 <br />$50,000.00 <br />$50,000.00 <br />2401.618 <br />BRIDGE DECK PLANING (P) <br />SQ FT <br />25100 <br />$0.60 <br />$15,060.00 <br />2402.583 <br />ORNAMENTAL METAL RAILING TYPE SPECIAL (P) <br />LIN FT <br />288 <br />$145.00 <br />$41,760.00 <br />2402.584 <br />STRUCTURAL TUBE RAILING DESIGN T -2 (P) <br />LIN FT <br />291 <br />$110.00 <br />$32,010.00 <br />2402.595 <br />BEARING ASSEMBLY <br />EACH <br />54 <br />$900.00 <br />$48,600.00 <br />2404.501 <br />CONCRETE WEARING COURSE (3U17A) (P) <br />SQ FT <br />27041 <br />$4.00 <br />$108,164.00 <br />2405.502 <br />PRESTRESSED CONCRETE BEAMS MN63 (P) <br />LIN FT <br />3421 <br />$230.00 <br />$786,830.00 <br />2405.511 <br />DIAPHRAGMS FOR TYPE MN63 PREST BEAMS (P) <br />LIN FT <br />687 <br />$70.00 <br />$48,090.00 <br />2411.618 <br />ARCHITECTURAL SURFACE FINISH (SINGLE COLOR) (P) <br />SQ FT <br />2454 <br />$2.00 <br />$4,908.00 <br />2411.618 <br />ARCHITECTURAL CONCRETE TEXTURE (BUSH HAMMER) (P) <br />SQ FT <br />2454 <br />$8.00 <br />$19,632.00 <br />2442.501 <br />REMOVE EXISTING BRIDGE <br />LUMP SUM <br />1 <br />$40,000.00 <br />$40,000.00 <br />2452.510 <br />STEEL H- PILING DRIVEN 12" <br />LIN FT <br />7110 <br />$3.00 <br />$21,330.00 <br />2452.511 <br />STEEL H- PILING DELIVERED 12" <br />LIN FT <br />7110 <br />$34.00 <br />$241,740.00 <br />2452.520 <br />STEEL H -TEST PILE 70 FT LONG 12" <br />EACH <br />3 <br />$6,000.00 <br />$18,000.00 <br />2452.520 <br />STEEL H -TEST PILE 80 FT LONG 12" <br />EACH <br />6 <br />$7,000.00 <br />$42,000.00 <br />2452.602 <br />PILE TIP PROTECTION 12" <br />EACH <br />117 <br />$100.00 <br />$11,700.00 <br />2502.502 <br />DRAINAGE SYSTEM TYPE (B910) <br />LUMP SUM <br />1 <br />$5,000.00 <br />$5,000.00 <br />2514.501 <br />CONCRETE SLOPE PAVING (P) <br />SQ YD <br />640 <br />$125.00 <br />$80,000.00 <br />2545.509 <br />CONDUIT SYSTEM (SIGNALS) <br />LUMP SUM <br />1 <br />$6,000.00 <br />$6,000.00 <br />ESTIMATED TOTAL CONSTRUCTION COST: <br />$15,034,409.02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.