Laserfiche WebLink
CITY OF LINO LAKES <br />ENGINEERING (101 -417) <br />BUDGET DETAIL <br />Obiect Code <br />4300 -000 Professional Services 50,000 <br />Surface Water Mgmt Plan (funding from Surface Water Mgmt Fund) <br />4410 -000 Contractual Services <br />Engineering Consultant <br />Contracted Svcs: Annual Maintenance - Trimble GPS Software Maintenance Agmt <br />NOTE: <br />1) Street Reconstruction Feasibility Study for 2010 not included. Cost: $35,000 <br />2) Engineering Expenditures included elsewhere: <br />Building Dept. $5,000 <br />Water Department $30,000 <br />Sewer Department (estimate) $30,000 <br />Streets Dept. (contracted storm sewer) $18,000 <br />Pavement Management (estimate) $57,750 <br />$140,750 <br />Total Engineering including Comm. Dev $307,250 <br />166,500 <br />