COMPENSATING CHANGE ORDER NO. 2
<br />2008 SURFACE WATER MANAGEMENT PROJECT
<br />CITY OF UNO LADS, MINNESOTA
<br />TKDA PROJECT NO. 14043.003
<br />PERIOD ENDING: August 13, 2009
<br />•
<br />ITEM CONTRACT QUANTITY UNIT AMOUNT NET CONTRACT
<br />NO. DESCRIPTION UNIT QUANTITY TO DATE PRICE TO DATE CHANGE AMOUNT
<br />PROJECT 1 • 496 LONESOME PINE
<br />1 MOBIUZATION EA 1.0 1.0 $ 400.00 S 400.00 $ $ 400.00
<br />2
<br />BUILD CATCH BASIN OVER EXISTING 21' ST. SEWER TYPE 409
<br />3 4' PERFORATED DRAINTILE WITH ROCK & FABRIC WRAP
<br />4 INSTALL YARD DRAIN BOX
<br />5 TOPSOIL
<br />6 SILT FENCE
<br />7 SPRINKLER REPAIR
<br />8 SOD
<br />• 9 DRAINTILE TEES WITH CAPS
<br />• 10 REMOVE BUSH AT HOMEOWNERS REQUEST
<br />SUBTOTAL PROJECT 1
<br />PROJECT 2 - OLD BIRCH STREET
<br />1 MOBILIZATION
<br />2 CLEAN STORM SEWER PIPE
<br />3 CLEAN/OPEN STORM SEWER OUTFALL
<br />4 SEED / RESTORATION
<br />SUBTOTAL PROJECT 2
<br />S<' q
<br />1.0 1.0 $ 4,131.00 $ 4,131.00 $ - $ 4,131.00
<br />120.0 125.0 $ 20.00 $ 2,500.00 $ 100.00 $ 2,400.00
<br />1.0 1.0 $ 3,450.00 $ 3,450.00 $ - $ 3,450.00
<br />20.0 - $ 50.00 $ - $ (1,000.00) $ 1,000.00
<br />30.0 20.0 $ 5.00 $ 100.00 $ (50.00) $ 150.00
<br />1.0 - $ 650.00 $ $ (650.00) $ 650.00
<br />1,000.0 150.0 $ 4.00 $ 600.00 $ (3,400.00) $ 4,000.00
<br />3.0 $ 150.00 $ 450.00 $ 450.00 $
<br />1.0 $ 250.00 $ 250.00 $ 250.00 $
<br />$ 11,611.00 $ (4,300.00) $ 16,111.00
<br />EA 1.0 1.0 $ 400.00 $ 400.00 $ $ 400.00
<br />LF 90.0 90.0 $ 10.00 $ 900.00 $ - $ 900.00
<br />EA 6.0 6.0 $ 1,200.00 $ 7,200.00 $ - $ 7,200.00
<br />LS 1.0 1.0 $ 700.00 $ 700.00 $ - $ 700.00
<br />$ 9,200.0 $ - $ 8,200m
<br />PROJECT 3 - BIRCH STREET
<br />1 MOBILIZATION EA 1.0 - $ 400.00 $ - $ (400.00) $ 400.00
<br />2 COMMON EXCAVATION CY 40.0 $ 75.00 $ - $ (3,000.00) $ 3,000.00
<br />3 SOD SY 200.0 - $ 4.00 $ - $ (800.00) $ 800.00
<br />4 SILT FENCE LF 50.0 - $ 5.00 $ - $ (250.00) $ 250.00
<br />SUBTOTAL PROJECT 3 $ - $ (4,4511.00) $ 4,450.00
<br />PROJECT 4 - RUFFED GROUSE COURT
<br />1 MOBILIZATION EA 1.0 1.0 $ 400.00 $ 400.00 $ $
<br />2 CLEAN/OPEN STORM SEWER OUTFALL EA 1.0 1.0 $ 2,500.00 $ 2,500 -DD $ $ 2.5
<br />3 SEED / RESTORATION LS 1.0 1.0 $ 1,000.00 $ 1,000.00 $ $ 1,000.00
<br />• 4 DITCH TO DRAIN LF - 50.0 $ 10.00 $ 500.00 $ 500.00 $ -
<br />• 5 REMOVE CLUMP OF TREES LS 1.0 $ 500.00 $ 500-00 $ 500.00 $ -
<br />SUBTOTAL PROJECT 4 $ 4,900.01 $ 1,000.00 $ 3,900.00
<br />PROJECT 6 - OSPREY COLDtT
<br />1 MOBIUZATION EA 1.0 1.D $ 400.00 $ 400.00 $ $ 400.00
<br />2 CLEAN/OPEN STORM SEWER OUTFALL EA 1.0 1.0 $ 2,500.00 $ 2,500.00 $ - $ 2,500.00
<br />3 SEED / RESTORATION LS 1.0 1.0 $ 550.00 $ 550.00 $ - $ 550.00
<br />SUBTOTAL PROJECT 6 $ 3,460110 $ - $ 3,450.00
<br />PROJECT 6 - HODGSOI
<br />1 MOBILIZATION
<br />2 CLEAN/OPEN STORM SEWER OUTFALL
<br />3 DITCHING
<br />4 SEED / RESTORATION
<br />SUBTOTAL PROJECT
<br />EWA= JAMMLOBag
<br />1 MOBILIZATION
<br />2 CLEAN STORM SEWER PIPE
<br />3 SEED / RESTORATION
<br />• 4 ADDmONAL MOBILIZATION
<br />• 5 CLEAWOPEN STORM SEWER OUTFALL
<br />• 6 CLEAR AND GRUB BRUSH/SMALL TREES
<br />• 7 EXTEND OUTFALL PIPE
<br />• 8 PLACE RIP RAP, ABOUT 8 CY
<br />SUBTOTAL PROJECT 7
<br />EA 1.0 1.0 $ 400.00 $ 400.00 $ - $ 400.00
<br />EA 1.0 1.0 9 2,000.00 $ 2,000.00 $ - $ 2,000.00
<br />LF 150.0 100.0 $ 14.00 $ 1,400.00 $ (700.00) $ 2,100.00
<br />LS 1.D 1.0 $ 1,100.00 $ 1,000.00 $ - $ . 1,000.00
<br />$ 4,100111 $ (700.00) $ 6,600.00
<br />66gg6��i
<br />1.0 1.D $ 400.00 $ 400-00 $ - $ 400.00
<br />500.0 500.0 $ 10.00 $ 5,000.00 $ - $ 5,000.00
<br />1.0 1.0 $ 1,500.00 $ 1,500-00 $ $ 1,500.00
<br />1.0 $ 1,500.00 $ 1,500.00 $ 1,500.00 $
<br />1.0 $ 2,500.00 $ 2,500.00 $ 2,500.00 $
<br />1.0 $ 500.00 $ 500.00 $ 500.00 $
<br />1.0 $ 800.00 $ 600.00 $ 800.00 $
<br />1.0 $ 1,600.00 $ 1,600.00 S 1,600.00 $ -
<br />$ 13,800.00 $ 1,100.00 $ 6,900.00