Laserfiche WebLink
11. PROPOSED IMPROVEMENTS <br />PINE STREET PAVING IMPROVEMENTS <br />(From: Lake Drive to 4th Avenue /Jodrell Street <br />and Lake Drive to the Western Terminus) <br />1. BACKGROUND <br />CITY OF COLUMBUS, MINNESOTA <br />CITY OF LINO LAKES, MINNESOTA <br />In 2005 a petition was submitted for the paving of Pine Street. Both the City of Lino Lakes <br />and the City of Columbus conducted surveys of the residents to determine support for the <br />paving of Pine Street. City of Lino Lakes responses resulted in 25% for paving, 34% <br />against paving, and 41 % did not respond. The residents in the City of Columbus voted <br />54% in favor of paving Pine Street from Lake Drive to the western terminus and 63% in <br />favor of paving from Lake Drive to 4th Avenue /Jodrell Street. Due to a lack of interest no <br />further action was taken by either the City of Lino Lakes or the City of Columbus. <br />In April 2009, the City of Lino Lakes received a petition to research the costs of paving <br />Pine Street. A survey was sent to Lino Lake's residents along Pine Street to gauge <br />interested in the project. The survey responses resulted in 86% of the residents living east <br />of the intersection of Pine Street and 4th Avenue /Jodrell Street being in favor of the <br />project. Per the results of the survey, and communication with the City of Columbus the <br />Lino Lakes City Council ordered preparation of a feasibility study for the paving of Pine <br />Street from Lake Drive to 4th Avenue /Jodrell Street and Lake Drive to the Westem <br />Terminus of Pine Street. The City of Columbus approved a motion to share the cost of <br />completing the feasibility study. Past resident surveys and current interest in the City of <br />Columbus have shown enough support to order the completion of a feasibility study. <br />Once the feasibility study is complete, both the City of Columbus and the City of Lino <br />Lakes will review the study and determine the next step in the improvement process. <br />STREET IMPROVEMENTS: <br />The existing gravel roadbed is approximately 26 feet wide from Lake Drive to 4th Avenue / <br />Jodrell Street and then 24 to 26 feet wide from 4th Avenue / Jodrell Street to the west end <br />1 0014292.005 <br />• <br />• <br />• <br />