My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/28/2009 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2009
>
09/28/2009 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2014 10:47:26 AM
Creation date
5/27/2014 10:16:15 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/28/2009
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rice Creek Watershed district rule C6 requires rate control for the Pine Street Paving <br />Project. The rate control rule requires that the stormwater runoff rate for the proposed <br />project does not exceed the existing runoff rate for critical 2 year and 100 year frequency <br />events. The Rice Creek Watershed District is requiring submittal of a hydrologic model to <br />demonstrate the proposed runoff rates do not exceed the existing rates. Depending on the <br />results of the hydrologic model the watershed district may waive the rate control <br />requirements based on an exemption for projects discharging to large water bodies with <br />storage capacity. <br />In summary the Rice Creek Watershed District has exempted the Pine Street paving <br />project from the district's water quality and volume control requirements and is requiring <br />that the Pine Street Paving Project demonstrate that the project meets the district's rate <br />control requirements. <br />Hi. ESTIMATED PROJECT COST <br />Attached to this Report is a complete estimate of cost including construction, <br />contingencies, engineering, and all other miscellaneous costs. The total estimated project <br />cost is: <br />PINE STREET (Lake Drive to 4th Avenue /Jodrell Street) <br />Street Improvements $ 371,725 <br />Stormwater Management $ 26,775 <br />Total $ 398,500 <br />Project costs to be split 50% - 50% between Lino Lakes and Columbus <br />Amount to be Assessed (Lino Lakes) $ 199,250 <br />Amount to be Assessed (Columbus) $ 199,250 <br />PINE STREET (Lake Drive to Westem Terminus) <br />Street Improvements $ 649,415 <br />Stormwater Management $ 50,085 <br />Total $ 699,500 <br />Project costs to be split 50% - 50% between Lino Lakes and Columbus <br />Amount to be Assessed (Lino Lakes) $ 349,750 <br />Amount to be Assessed (Columbus) $ 349,750 <br />3 0014292.005 <br />• <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.