My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/26/2009 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2009
>
10/26/2009 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2014 11:35:40 AM
Creation date
5/28/2014 8:30:01 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/26/2009
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPLICATION FOR PAYMENT NO. 11 (Final) <br />4110H No: A- LINOL0305.03 <br />Contractor <br />W H Response <br />6800 Electric Drive <br />Rockford, MN 55373 <br />Location: Lino Lakes, Minnesota <br />Owner. City of Lino Lakes <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 -1182 <br />Contract for Legacy at Woods Edge - Phase 2 Contract Date: April 25, 2006 <br />Contract Amount $483,135.84 <br />Street Lighting <br />Period Ending April 30, 2009 <br />Quantity to <br />No. Item <br />Unit Est. Qty. Date Unit Price Total <br />LUMP SUM 1 1 $7,283.00 $7,283.00 <br />1 Mobilization <br />EACH 10 10 $100.00 $1,000.00 <br />2 Remove Lighting Unit <br />3 2 -inch Nonmetallic Conduit, Directionally Bored <br />1,F 100 754 $8.55 56,446.70 <br />4 3 -inch Nonmetallic Conduit (Schedule 40) <br />LF 50 53.90 <br />5 2 -inch Nonmetallic Conduit (Schedule 40) LF 300 200 53.04 $608.00 <br />6 1-1/2 -inch Nonmetallic Conduit (Schedule 40) LF 9000 9833 52.75 527,040.75 <br />41) 7 1 -1/4 -inch Nonmetallic Conduit (Schedule 40) LF 2500 684 52.70 51,846.80 <br />8 3/4 -inch Nonmetallic Conduit (Schedule 40) LF 3000 2116 5250 55,290.00 <br />9 Underground Wire, 1 Conductor No. 500 MCM LF 150 150 55.44 5816.00 <br />10 Underground Wire, 1 Conductor No. 3/0 L.F 500 290 53.17 5919.30 <br />11 Underground Wirt, 1 Conductor No. 12 L.F 12000 12350 50.32 53,952.00 <br />12 Underground Wire, 1 Conductor No. 10 LF 3500 2878 50.38 51,093.64 <br />13 Underground Wire, 1 Conductor No. 8 LF 30000 30350 50.55 516,692.50 <br />14 Underground Wire, 1 Conductor No. 6 L.F 1300 1443 50.69 $995.67 <br />15 Underground Wire, 1 Conductor No. 3 LF 1900 1951 51.10 52,146.10 <br />EACH 13 13 5202.15 52,627.95 <br />16 Handhole <br />EACH 1 1 53,382.58 53,382_58 <br />17 Service Cabinet "A" <br />EACH 1 1 56,492.38 56,49238 <br />18 Service Cabinet "B" <br />EACH 1 1 53,095.03 53,095.03 <br />19 Service Cabinet "C" <br />•EACH 3 3 550650 51,519.50 <br />20 Ground Mounted Service Cabinet Foundation <br />21 Lighting Unit Type Special 1 EACH 18 18 53,346.55 560,237.90 <br />22 Lighting Unit Type Special 1 with Medallion <br />EACH 26 26 53,742.55 597,306.30 <br />35354ai Center Drive <br />o ..� ►AU S511n <br />Detail Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.