Laserfiche WebLink
2. All necessary permits shall be obtained by the applicant from Anoka County for <br />work in the Lake Drive (CSAH 23) right of way. <br />3. The church shall enter into a site performance agreement for exterior work on the <br />site prior to commencing the work on the site. This shall include financial <br />securities according to current City requirements. <br />4. Parking lot lighting must be completed as shown on submitted plan and fixture <br />cut sheets. A pedestal for a light installed near the Lake Drive driveway is not <br />included on the lighting plan and does not meet required setback from a right of <br />way. It must be removed. <br />5. Parking lot and sign lighting shall comply with the hours of operation for <br />commercial businesses as regulated by the zoning code. <br />6. The installed flagpole lighting shall be removed. <br />7. Signage is governed by the City's sign ordinance and permits are required for all <br />signs. The location of any ground sign must be identified on a plan. <br />8. If parking or traffic generation create safety problems in the future, the City may <br />revisit the CUP and consider adding additional conditions to resolve such issues <br />such as traffic control personnel or other measures. The City may call a review <br />meeting of representatives from law enforcement officers, the church, and the <br />neighborhood to review traffic issues and ascertain the need for providing traffic <br />control or other reasonable measures, which the church shall provide. This <br />condition is in lieu of requiring a traffic study for the church use. <br />9. The parking, landscaping, and any other exterior work shall be completed in <br />accordance with the plans. <br />10. Final site grading and erosion control must be completed in accordance with the <br />approved plans. This includes removal of the old building foundation/slab, re- <br />shooting elevations, grading the rest of the south end of the site and the county <br />roadway ditch to the design criteria, and finishing grading of the rest of the site. <br />11. The south parking lot curbing and drainage improvements must be completed <br />according to plans. <br />12. The south parking lot sub -base and first lift of asphalt must be completed <br />according to plans. <br />13. In the area of the existing access to the back yard of the property to the east, any <br />alterations necessary to ensure proper drainage and other compliance with plans <br />must be made as directed by the City Engineer. <br />14. The final lift of asphalt must be completed over the entire site according to plans. <br />—67— <br />Resolution 09 -90, page 2 <br />• <br />