My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11/23/2009 Council Packet (2)
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2009
>
11/23/2009 Council Packet (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2014 4:35:41 PM
Creation date
5/28/2014 12:22:15 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/23/2009
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ESTIMATE NO. 1 <br />•2009 SURFACE WATER MANAGEMENT PROJECT <br />CITY OF LINO LAKES, MINNESOTA <br />TKDA PROJECT NO. 14292.004 <br />• <br />ITEM <br />NO. <br />DESCRIPTION <br />PERIOD ENDING: November 6, 2009 <br />CONTRACT QUANTITY UNIT AMOUNT <br />UNIT QUANTITY TO DATE PRICE TO DATE <br />PROJECT 11 - DIANE STREET <br />1 MOBILIZATION LS 1 1.0 $ 500.00 $ 500.00 <br />2 CLEAN /OPEN STORM SEWER OUTFALL EA 1 1.0 $ 500.00 •$ 500.00 <br />3 CLEAN STORM SEWER PIPE LF 50 0.0 $ 10.00 $ - <br />4 CLEAR AND GRUB TREE (4" DIA OR GREATER) EA 2 2.0 $ 200.00 $ 400.00 <br />5 REGRADE DITCH LF 30 30.0 $ 30.00 $ 900.00 <br />6 SEED / RESTORATION LS 1 1.0 $ 500.00 $ 500.00 <br />SUBTOTAL PROJECT 11 $ 2,800.00 <br />PROJECT 12 - COUNTRY LANE <br />1 MOBILIZATION LS 1 1.0 $ 500.00 $ 500.00 <br />2 SALVAGE AND REINSTALL SPLIT RAIL FENCE LF 30 10.0 $ 10.00 $ 100.00 <br />3 CLEAN/OPEN STORM SEWER OUTFALL EA 1 _ 1.0 $ 500.00 $ 500.00 <br />4 EXCAVATION AND GRADING CY 15 15.0 $ 70.00 $ 1,050.00 <br />5 CLEAN STORM SEWER PIPE LF 200 0.0 $ 10.00 $ - <br />6 SEED / RESTORATION LS 1 1.0 $ 500.00 $ 500.00 <br />SUBTOTAL PROJECT 12 $ 2,650.00 <br />SUBTOTAL ESTIMATE NO. 1 $ 71,087.00 <br />CHANGE ORDER NO. 1 <br />PROJECT 4 - WEST SHADOW LAKE DRIVE CROSSING <br />2 CLEAN/OPEN STORM SEWER OUTFALL EA 1 0.0 $ (500.00) $ <br />5 REGRADE DITCH LF 150 0.0 $ (25.00) $ <br />SUBTOTAL PROJECT 4 $ <br />PROJECT 6 - APOLLO MEADOWS TOWNHOMES <br />9 CLEAR AND GRUB TREE (4" DIA OR GREATER) EA 2 2.0 $ 200.00 $ 400.00 <br />10 COMMON BORROW .(FILL OVER PIPE) CY 48 48.0 $ 10.00 $ 480.00 <br />SUBTOTAL PROJECT 6 $ 880.00 <br />PROJECT 7 - LOIS LANE <br />10 CLEAN STORM SEWER PIPE <br />SUBTOTAL PROJECT 7 <br />PROJECT 8 - BLACKBIRD LANE <br />9 EROSION CONTROL BLANKET CATEGORY 3 <br />SUBTOTAL PROJECT 8 <br />LF 50 0.0 $ 10.0D $ <br />$ <br />SY <br />60 60.0 $ 2.00 $ 120.00 <br />$ 120.00 <br />PROJECT 10 - JAMES STREET <br />7 CLASS III RIPRAP W/ FABRIC CY 2 2.0 $ 150.00 $ 300.00 <br />SUBTOTAL PROJECT 10 $ 300.00 <br />PROJECT 13 - BIRCH STREET TRENCH DRAIN <br />1 INSTALL TRENCH DRAIN IN CONCRETE LS <br />2 CLASS II RIPRAP W/ FABRIC CY <br />SUBTOTAL PROJECT 13 <br />SUBTOTAL CHANGE ORDER NO. 1 <br />1 <br />5 <br />1.0 $ 4,500.00 $ 4,500.00 <br />5.0 $ 100.00 $ 500.0D <br />$ 5,000.00 <br />• <br />$ 6,300.00 <br />TOTAL ESTIMATE NO.1 $ 77,387.00 <br />-121- <br />
The URL can be used to link to this page
Your browser does not support the video tag.