My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/14/2009 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2009
>
12/14/2009 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2014 1:41:28 PM
Creation date
5/29/2014 10:15:38 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/14/2009
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF LINO LAKES <br />ENGINEERING (101 -417) <br />BUDGET DETAIL <br />Object Code <br />4300 -000 Professional Services 50,000 <br />Surface Water Mgmt Plan (funding from Surface Water Mgmt Fund) <br />4410 -000 Contractual Services <br />Engineering Consultant <br />Contracted Svcs: Annual Maintenance - Trimble GPS Software Maintenance Agmt <br />NOTE: <br />1) Street Reconstruction Feasibility Study for 2010 not included. Cost: $35,000 <br />2) Engineering Expenditures included elsewhere: <br />Building Dept. $5,000 <br />Water Department $30,000 <br />Sewer Department (estimate) $30,000 <br />Streets Dept. (contracted storm sewer) $18,000 <br />Pavement Management (estimate) $57,750 <br />$140,750 <br />Total Engineering including Comm. Deg $307,250 <br />D -22 <br />50,000 <br />165,000 <br />1,500 <br />166,500 <br />• <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.