My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2012 Annual Budget Adopted
LinoLakes
>
Finance
>
Budget
>
Budget Adopted
>
2012 Annual Budget Adopted
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2014 3:49:35 PM
Creation date
5/30/2014 2:29:31 PM
Metadata
Fields
Template:
Finance Dept
Finance Category
Budget
Finance Document Folder
Budget Adopted PERM
Finance Number Identifier
2012 Annual Budget Adopted
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEERING (101 -417) <br />BUDGET DETAIL <br />Obiect Code <br />CITY OF LINO LAKES <br />4300 -000 Professional Services <br />Traffic Counts <br />Engineering Consultant (hourly) <br />4410 -000 Contractual Services <br />Engineering Consultant (Retainer) <br />Contracted Svcs: Annual Maintenance - Trimble GPS Software Maintenance Agmt <br />52,500 <br />53,900 <br />5000 -000 Capital Outlay 8,500 <br />Trimble GPS hardware /software Upgrade <br />NOTE: <br />1) Street Reconstruction Feasibility Study for 2010 not included. Cost: $35,000 <br />2) Engineering Expenditures included elsewhere: <br />Building Dept. $5,000 <br />Water Department $25,000 <br />Sewer Department (estimate) $25,000 <br />Streets Dept. (contracted storm sewer) $18,000 <br />Pavement Management (estimate) $70,000 <br />$143,000 <br />Total Engineering including Comm. Dev $249,400 <br />
The URL can be used to link to this page
Your browser does not support the video tag.