My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/09/2001 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2001
>
05/09/2001 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2014 10:09:00 AM
Creation date
6/2/2014 11:24:46 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
05/09/2001
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
John Powell Page 2 May 1, 2001 <br />Target <br />location of the emergency overflow. The low floor elevation for each building site must <br />also be labeled. <br />5. Included in the plans submitted to the City for review was a site infiltration plan. <br />Included in the plan are the locations of several bio retention basins. The bio retention <br />basins appear to be located primarily in the parking lot islands and medians, which are <br />surrounded by concrete curb and gutter. Additional information must be provided that <br />illustrates how the storm water runoff from the site enters the bio retention basins. <br />6. The City of Lino Lakes requires that the construction details must be included in the plan <br />set. Some of the details that are needed are erosion control measures, storm sewer <br />manholes, catch basins, and outlet control structures. <br />7. Included in the storm calculations was the use of a broad crested weir. The location of <br />the weir must be shown on the grading plan. <br />8. The proposed utility plan includes the connection to the City watermain on 79`h Street <br />• and on Lake Drive, as well as a connection to the sanitary sewer on Lake Drive. <br />Currently, there is an existing 21" sanitary sewer main and a 12" watermain that runs <br />parallel to Lake Drive on the east side. The existing watermain on 79th Street is 8 inch. <br />The utility plan must include the length a slope of the proposed sanitary sewer. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.