My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/09/2001 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2001
>
05/09/2001 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2014 10:09:00 AM
Creation date
6/2/2014 11:24:46 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
05/09/2001
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />AGENDA ITEM V. K <br />STAFF ORIGINATOR: Jeff Smyser <br />P & Z MEETING DATE: May 9, 2001 <br />TOPIC: Site & Building Plan Review <br />MN Dept. of Corrections <br />BACKGROUND <br />The Minnesota Dept. of Corrections plans to construct a pole barn for vehicle storage on <br />its site. The building will be outside of the prisoner compound but within a separate <br />fenced area. The City of Lino Lakes has no legal zoning jurisdiction over State of <br />Minnesota land. Therefore, the Dept. of Corrections is not obligated to submit this <br />project for City review. However, the Dept. has done so as a courtesy. <br />This report includes details from the large plan sheet that includes a site plan, floor plan, <br />and building elevations, dated 04/1/2001. <br />ANALYSIS <br />The fenced area where the buildng will be added is approximately 1000 feet from the <br />• <br />nearest property line. <br />• <br />• Building <br />The pole barn building is 40' x 72', with a footprint of 2880 sf. The building will be <br />approximately 22' high. <br />The building site is screened from properties on Lilac Drive to the north by a large <br />forested area. Significant tree growth also serves to screen properties to the west along <br />Patti Drive. <br />No additional access road or driveway onto a public road is needed. No connection to <br />City utilities is needed. <br />The Dept. of Corrections has provided this information as a courtesy, and asks for <br />comments from the City. <br />For information purposes, the Dept. of Corrections often delegates building code <br />enforcement to the City through a special agreement. This allows the City to collect <br />building permit fees to cover review and inspection costs. We anticipate this will occur <br />for this building. <br />RECOMMENDATION <br />Provide comment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.