My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/11/2001 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2001
>
07/11/2001 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2014 11:05:27 AM
Creation date
6/3/2014 10:38:10 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
07/11/2001
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Planning & Zoning Board <br />June 13, 2001 <br />Page 21 <br />d. All grading, drainage and utility plans are subject to review and approval of the <br />City Engineer. <br />e. Outlots A and D, minus the area of land necessary to replace existing park land <br />lost with extension of Arlo Lane, are dedicated in partial satisfaction of park <br />dedication requirements. The balance of required parkland dedication will be <br />provided in the form of cash fee in lieu of land as prescribed by the Subdivision <br />Ordinance. <br />f. Outlots B and C are conveyed to the appropriate landowners for access and a <br />buffer strip, respectively. <br />and was supported by Mr. Corson. Motion carried 3 -1 (Lyden). <br />Mr. Zych arrived at 9:50 p.m. <br />The developer stated if this did stay parkland, he would plant additional pine trees between the <br />Judd property and the park. <br />AMENDMENT to the first motion as seconded and approved to recommend a 28 -foot street <br />width within the subdivision as opposed to the 32 -foot width. Motion carried 3 -1 (Lyden) -1 <br />(Zych). <br />H. CONTINUED PUBLIC HEARING, Ryan Companies UD, Inc. (Target), <br />• Lake Drive <br />• <br />Chair Schaps reopened the public hearing at 9:51 p.m. <br />Staff presented the application by explaining Staff had been working with Ryan Companies, US <br />Inc. on a proposed retail development located in the northeast quadrant of Lake Drive /I -35 W. <br />Interchange. The Planning and Zoning Board reviewed the concept plan for the site in December <br />of 2000 and opened the public hearing on February 13, 2001 with periodic updates since the <br />initial hearing. <br />Staff stated the main issues raised by staff, and discussed by the City Council and Planning and <br />Zoning Board at the concept stage related to the site layout and design and the departure from the <br />Town Center vision. <br />Staff indicated the direction provided through the concept process was to incorporate special <br />pedestrian- oriented design features, as well as some special architectural elements into the <br />proposal with the goal being an "above average shopping center ". <br />Staff stated the submittal that was reviewed in February 2001 had been modified; this review <br />was based on plan submittals stamped received by the City on May 18, 2001. <br />Staff indicated many outstanding issues remain related to the site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.