Laserfiche WebLink
Mr. Jeff Smyser <br />• July 6, 2001 <br />Page 3 <br />• <br />2. As part of our review we modeled the proposed watermain system. The proposed system <br />will provide adequate pressure as well as fire flows. <br />Street Plan <br />1. A detailed transportation impact study was completed by Steve Elmer of TKDA for this <br />project. At the request of the developer, a second signalized intersection was included in the <br />study as an option. The Anoka County Highway Department has stated that they will not <br />permit a second signalized intersection for this site. The second intersection must be a right - <br />in right -out situation. The developer has stated that the second signalized intersection is <br />absolutely necessary for this site. This matter still needs to be resolved. <br />2. The site does not include access from the existing 77th Street. The decision not to connect <br />to 77th Street was the developer's and was not required by City staff. <br />Miscellaneous <br />1. Copies of approvals from the necessary review and regulatory agencies including the Rice <br />Creek Watershed District, Minnesota Department of Transportation, and Anoka County <br />Highway Department must be submitted. <br />John Powell will review the information contained in this letter when he returns on July 9, 2001. <br />He may have additional comments at that time. Should you have any questions, please contact <br />me at (651) 292 -4630. <br />Sincerely, <br />ason C. Wedel, P.E. <br />Enclosure <br />cc: John Powell, City Engineer <br />