Laserfiche WebLink
From to 9822499 at 6/28/01 11:29 AM Pg 003/009 <br />• <br />• <br />• <br />Permit Application No. 01 -05 Glenn R. Rehbein, et. al. <br />7. Narrative of "structural soil" addressing the proposed silt <br />and clay content. Provide any soil analysis (e.g. measured <br />permeability) performed on this structural soil. <br />8. Infiltration trench detail providing sufficient separation <br />between trench bottom and water table. According to the <br />Minnesota Pollution Control Agency draft manual: <br />Protecting Water Quality in Urban Areas a minimum <br />three -foot distance should be provided below the bottom of <br />the infiltration practice and bedrock or the water table. <br />9. Depressed island detail providing curb cut or flush curb <br />details, depressional storage, adequate separation between <br />bottom of practice and water table (at least three feet) and <br />specification of native vegetation seed mix or landscaping <br />plan. <br />10. Additional information for the bioretention basins in the <br />northwestern and southwestern corners of the site <br />including: depressional storage, outlet elevations, HWL's <br />for the design events, adequate separation between bottom <br />of practice and water table (at least three feet) and <br />specification of native vegetation seed mix or native <br />landscaping plan. <br />11. Narrative addressing consideration of pervious parking and <br />green roof (contact Curt Sparks @ North American <br />Wetland Engineering, 651- 433 -215, for design <br />considerations). <br />12. Quantification of floodplain fill and compensatory storage <br />measures below elevation of 886.9. <br />13. Identification on Grading Plan of detention pond <br />emergency overflow and stabilization measures. <br />14. Revised lowest proposed first floor elevation (if necessary) <br />complying with District 2 -foot, 100 -year and 1 -foot, <br />emergency overflow elevation freeboard requirements (per <br />Pending Item 1). <br />15. Revised erosion control plan specifying riprap at all storm <br />sewer outfalls, detailed re- vegetation specifications, and an <br />implementation schedule. <br />6/27/01 <br />