My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/10/2001 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2001
>
10/10/2001 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2014 11:55:27 AM
Creation date
6/4/2014 9:36:40 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
10/10/2001
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />Molin Concrete <br />October 10, 2001 <br />page 11 <br />Molin had a noise measurement analysis performed in October 2000 by Wenck <br />Associates. On October 24, the firm took readings from 4:30 am to 5:30 am and from <br />5:30 am to 6:30 am. On October 25, the firm took readings from 4:30 am to 5:30 am. <br />The readings indicated no violation of MPCA noise rules during those times. MPCA did <br />state in a conversation with City staff that if a test is conducted by established methods, <br />MPCA typically accepts the results of the test. <br />Neighbors are not satisfied by the Wenck analysis. Staff contacted the MPCA to see if <br />MPCA could conduct the analysis. This is possible, but there is a waiting period of <br />several months. <br />Instead, the City hired a noise analysis consultant to perform another analysis. The new <br />analysis is underway and staff hopes to have the results for the October 10 P & Z <br />meeting. <br />ENVIRONMENTAL BOARD COMMENTS <br />As noted in the attached memo from the Environmental Specialist, on August 29 the <br />Environmental Board tabled the project pending; submission of landscape plan, tree <br />inventory, Rice Creek Watershed's TWAFFA requirement information, lighting plan, an <br />understanding of chemical use on the site, use of well heads on site as indicated by the <br />County Well Point Index. The landscape plan should show the use of native groundcover <br />plants and trees, the berm area on the north should be looked at for effectiveness and the <br />use of irrigation, and the City should re -focus on the priorities set forth in the current <br />Surface Water management Plan review process so that the surface water issues are better <br />understood in plan review sites such as Molin Concrete. <br />It is not clear why the Environmental Board did not receive the submitted landscape plan. <br />The landscaping plan was approved in 1997. The new plan is a revision of the previously <br />approved plan, and the drought - resistant species have already been planted. <br />No tree loss will occur from the proposed new building. The Rice Creek Watershed has <br />granted its preliminary approval. A complete lighting plan will be a condition of <br />approval before City Council review. Chemical use on the site is not changing, nor are <br />any new wells being proposed. <br />The City's surface water plan must be consistent with the Watershed plan. Both the <br />Watershed and the City include surface water plan requirements in the review all <br />projects. <br />
The URL can be used to link to this page
Your browser does not support the video tag.