My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/10/2001 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2001
>
10/10/2001 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2014 11:55:27 AM
Creation date
6/4/2014 9:36:40 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
10/10/2001
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Molin Concrete <br />October 10, 2001 <br />page 13 <br />• <br />In addition to those general findings, a CUP for a concrete product plant must include the <br />following provisions (Sec. 8 Subd. 2.I.9): <br />a. All applicable Minnesota Pollution Control Agency requirements are satisfactorily <br />met. <br />b. A drainage system subject to the approval of the City Engineer shall be installed. <br />c. Storage areas are landscaped, fenced and screened from view of neighboring uses, <br />abutting residential zoning districts and public rights -of -way in compliance with <br />Section 3, Subd. 4.S. <br />d. Vehicular access points shall create a minimum of conflict with through traffic <br />movement and shall be subject to approval of the City Engineer. <br />e. All signing and informational or visual communication devices shall be <br />compliance with the applicable provisions of Appendix C of the City Code. <br />f. Provisions shall be made to control and minimize noise, air and water pollution. <br />g. All conditions pertaining to a specific site are subject to change when the Council, <br />upon investigation in relation to a formal request, finds that the general welfare or <br />public betterment can be served as well or better by modifying the conditions. <br />These provisions are addressed in the recommended conditions of approval. <br />CONDITIONS OF APPROVAL: Site Plan, Amended Conditional Use Permit, <br />Amended Interim Use Permit <br />The following list includes specific conditions and then specifies which permit and/or <br />approval it applies to. The "entire site" is the entire 55 acres, which is covered by the <br />conditional use permit. The northern portion is the 20 -acre area zoned LI and covered by <br />the interim use permit. The southern portion of the site is 35 acres and is zoned GI. The <br />site plan review is for the proposed new extruded precast manufacturing building, <br />overhead cranes, silos, and associated grading and site work. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.