My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/10/2001 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2001
>
10/10/2001 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2014 11:55:27 AM
Creation date
6/4/2014 9:36:40 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
10/10/2001
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />Molin Concrete <br />October 10, 2001 <br />page 2 <br />zoned LI, the southern 35 acres is zoned GI. Surrounding land use and zoning is shown <br />in the table: <br />Site and Building Plan Review <br />Structure: The proposed new structure is a building for extruded precast <br />manufacturing. The building is approximately 600 feet long and 66' wide. It will have <br />precast concrete walls 36' high for the majority of the building. There will be a smooth <br />band with windows four feet wide at the 25' height. Near the south end the building <br />itself will increase to 45' high, then decrease to 11'. <br />At the south end there will be two cement silos rising to approximately 70 ft. in height. <br />Near the silos are below -grade material bins for aggregate and sand. <br />The building will cover approximately 38,000 sf. The silos and material bins will use <br />additional area. <br />Height: As stated above, the proposed new production facility includes two <br />cement silos rising to approximately 70' in height. The height maximum in the GI zone <br />is 45'. Under Section 3 Subd. 4.C.3. of the zoning ordinance, building heights in excess <br />of the standards of the districts may be allowed through a conditional use permit, <br />provided that: <br />a. Demonstrated need is established for the increase in height and said increase will <br />not violate the intent and character of the zoning district in which the structure is <br />located. <br />comment: The production facility requires the cement silos. The GI zoning <br />district is the City's most intense industrial zone. The GI zone, as stated in the <br />purpose paragraph of the ordinance, is for "areas which, because of availability to <br />thoroughfares, suitable topography, and isolation, are appropriate for industrial <br />uses of a more intense nature and ones which may have certain nuisance <br />characteristics." <br />Existing Land Use <br />Comp. Plan Land Use Map <br />Zoning <br />site <br />industrial <br />Industrial <br />GI and LI <br />north <br />residential <br />Low Density Unsewer. Resid. <br />Rural <br />east <br />residential, <br />cemetery <br />Low Density Unsewer. Resid. <br />Industrial <br />Commercial <br />Rural <br />GI (cemetery) <br />south <br />industrial <br />Industrial <br />GI <br />west <br />residential <br />Lino Air Park <br />Low Density Unsewer. Resid. <br />Rural <br />R -1 <br />Site and Building Plan Review <br />Structure: The proposed new structure is a building for extruded precast <br />manufacturing. The building is approximately 600 feet long and 66' wide. It will have <br />precast concrete walls 36' high for the majority of the building. There will be a smooth <br />band with windows four feet wide at the 25' height. Near the south end the building <br />itself will increase to 45' high, then decrease to 11'. <br />At the south end there will be two cement silos rising to approximately 70 ft. in height. <br />Near the silos are below -grade material bins for aggregate and sand. <br />The building will cover approximately 38,000 sf. The silos and material bins will use <br />additional area. <br />Height: As stated above, the proposed new production facility includes two <br />cement silos rising to approximately 70' in height. The height maximum in the GI zone <br />is 45'. Under Section 3 Subd. 4.C.3. of the zoning ordinance, building heights in excess <br />of the standards of the districts may be allowed through a conditional use permit, <br />provided that: <br />a. Demonstrated need is established for the increase in height and said increase will <br />not violate the intent and character of the zoning district in which the structure is <br />located. <br />comment: The production facility requires the cement silos. The GI zoning <br />district is the City's most intense industrial zone. The GI zone, as stated in the <br />purpose paragraph of the ordinance, is for "areas which, because of availability to <br />thoroughfares, suitable topography, and isolation, are appropriate for industrial <br />uses of a more intense nature and ones which may have certain nuisance <br />characteristics." <br />
The URL can be used to link to this page
Your browser does not support the video tag.