My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/08/2002 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2002
>
05/08/2002 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2014 3:38:34 PM
Creation date
6/5/2014 12:04:14 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
05/08/2002
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Memorandum <br />DATE: May 2, 2002 <br />TO: Mike Grochala <br />FROM: James E. Studenski, City Engineer j <br />RE: Raske Building Systems Site Plan Review <br />A site plan review of the submitted documents including a six -page drawing set dated <br />April 4, 2002, a Sketch and Description sheet dated April 8, 2002, a letter to RCWD <br />dated April, 11, 2002, with drainage calculations for the proposed Raske Building <br />Systems site has been performed. The following comments must be addressed prior <br />to a recommendation given for this site: <br />Watermain: <br />- An 18" vertical separation is required between the water line and the sanitary line. <br />- Existing water services must be located. <br />- The cover for watermain that is 10 inches or Tess is 8 feet. <br />Sanitary Sewer: <br />An 18" vertical separation is required between the water line and the sanitary line. <br />Existing sanitary services must be located. <br />A manhole structure will be required at the west end of the sanitary line. <br />Utility easements will be required for the main sanitary line. <br />Coordination and easements will be required on adjacent property to the east. <br />Street Standards: <br />Driveway entrance must maintain drainage to the existing storm sewer structure. <br />The construction entrance must note that the width is a minimum of 20 feet. <br />Storm Sewer /Grading: <br />The 4" PVC vent must be define as to it's use. <br />Approval is required from RCWD. <br />The trees shown in the south pond must be relocated. <br />Existing storm sewer flows to the north. <br />Attached is a memorandum dated May 1, 2002, which addresses the storm sewer and <br />grading design. <br />600 Town Center Parkway, Lino Lakes, Minnesota 55014 -1132 <br />Phone: 651 -982 -2400 • Fax: 651 - 932 -2499 • TDD: 651 -982 -2410 <br />
The URL can be used to link to this page
Your browser does not support the video tag.