My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/27/2000 Environmental Board Minutes
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Minutes
>
2000
>
09/27/2000 Environmental Board Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2016 11:56:36 AM
Creation date
6/5/2014 4:14:38 PM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Minutes
Meeting Date
09/27/2000
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL BOARD MEETING SEPTEMBER 27, 2000 <br />the Ordinance indicates 0.4 foot-candles at the property line if abutting residential <br />property. He noted the area to the south is residential property and the air base is also <br />zoned residential. <br />Asleson presented a computer graphic identifying the site and surrounding uses. Smyser <br />reviewed how the DNR determines the OHW if there is land at a higher elevation than the <br />OHW. He noted this site is a long distance from the water and there is high land between <br />the site and lake so the setback will probably not be an issue. <br />Russell Karasch, applicant, pointed out the location of the proposed building and pond. <br />He stated they have delineated the wetland which is not within their building pad and <br />would not be impacted. <br />Asleson noted the location of a wetland within the subject parcel according to the <br />National Wetlands Inventory. Mr. Karasch stated Metro Survey did the civil engineering <br />on this project. Asleson suggested staff verify the location of the wetland since, <br />sometimes, the National Wetlands Inventory is not correct. <br />Chair Lanyon asked how this wetland relatesto the on site retention pond. Mr. Karasch <br />stated none of the drainage will leave the site. He explained how the drainage will be <br />directed into the ditch line, through a culvert to the grassland, and then enter the holding <br />pond itself He stated they had showed using a swale, not a culvert, but he is unsure what <br />the watershed district will require as part,of their approval. Asleson stated it appears the <br />site has been designed for zero volume water. loss. Mr. Karasch stated that is correct. <br />Mr. Karasch stated there, should be no overflow of the parking lot lighting and the foot- <br />candles would be lower than the City. requirement. He reviewed the surrounding uses, <br />noting there is no abutting single family residential. Smyser stated he stands corrected, <br />and had thought the sublect:site was on the southern parcel rather than the northern <br />parcel. <br />Mr. Karasch reviewed:: their parking stall arrangement and landscape treatments. Trehus <br />asked if they will use landscape plantings to screen the parking areas from the street. Mr. <br />Karasch explained they are using the swale area along the street for drainage. <br />Asleson reviewed the recommendation of the Watershed District and requirements related <br />to ponding. Mr. Karasch stated they have received that information and revised the plans <br />to address each requirement. <br />Chair Lanyon questioned whether the Watershed District has found this site can handle <br />100% infiltration of all on-site drainage. <br />Donlin addressed the issue raised by Trehus related to screening from Lake Drive. She <br />explained that screening is an important issue to the Board in an effort to assure <br />aesthetically pleasing developments. Donlin stated it is important to screen this use from <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.