Laserfiche WebLink
ENVIRONMENTAL BOARD MEETING AUGUST 29, 2001 <br />town. If the project had been completed as the last plat indicated, the City would <br />resemble Oakdale or Lakeville. <br />O'Connell posed the question if the Council reopened the project, would the <br />Environmental Board review it and pass on recommendations. Grochala responded that <br />except for the infiltration issue, the bigger picture with a reduction in the tax rate made it <br />primarily an economic issue for the Council. <br />Asleson stated that the environmental issues were pushed as much as possible. <br />Donlin explained that because the supermarket -discount store merchandise was <br />inexpensive, it could put smaller retailers out of business. Grochala colninented on his <br />experience in Cambridge where a large retailer caused a turnover'in businesses from <br />town, but the smaller businesses created niches which benefited`froxm the'draw the larger <br />store brought to the area. <br />Donlin stated she did not want outsiders coming into =town to shop; and other neighbors <br />she spoke with agreed. Another issue would be that'low-ineore'housing would be <br />necessary to accommodate the workers. <br />Grochala introduced Tanda Gretz the new Associate Planner for the City. <br />B. Centennial School District/New Elementary School Site Plan Review/ Conditional <br />Use Permit — Asleson introduced John!Christansein Superintendent for Centennial <br />Schools, and reviewed the site which is.located off 4th Avenue and Highway 35W. He <br />reviewed the background for the ,site that ineluded the site being located in a lake <br />protection area where the soils were sandy, -Wet. In the past, there had been concerns with <br />Isanti wet soils on a floodplain;, <br />Chair Lanyon asked if the area included both the building and the land. Asleson <br />answered that it did. and that e Greenway was previously located through the area, but <br />had since been rerouted., <br />Trehus inquired as to, when,: he Greenway had been initially proposed. Asleson <br />responded that it wasproposed'in the 1992 City Plan. He continued, the landscape plan <br />showed that there were no significant trees, however there were many cedars that could <br />be moved. The landscape architect also suggested it. The salt spray from the adjacent <br />highway would inhibit the growth of the cedars, and staff suggested a hardier species <br />would be Colorado Blue Spruce. Infiltration areas were planned in the northwest and <br />there was a recommendation for a study on the surface water treatment. Native plantings <br />were suggested that would be resistant to salt spray. He indicated the school district <br />wanted to preserve the trees on the ends for a shelter break. <br />Chair Lanyon expressed concerns over water treatment and infiltration on site and <br />specifically as it related to the parking area. He suggested water quality issues were <br />straightforward enough for elementary students to grasp, and the district could create a <br />3 <br />