My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11/28/2007 Environmental Board Minutes
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Minutes
>
2007
>
11/28/2007 Environmental Board Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2022 10:41:09 AM
Creation date
6/6/2014 11:22:01 AM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Minutes
Meeting Date
11/28/2007
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL BOARD MEETING JULY 25, 2007 <br /> <br />A. Main Street Village Concept Plan – Azure Properties – PUD <br /> <br />Mr. Asleson presented his staff report to the board. This item has been previously <br />submitted for review. There were issues the developer needed to address before <br />the environmental board could move forward with this project. The issues have <br />since been addressed. <br /> <br />Mr. Asleson first reviewed the background information on this Item. He then <br />reviewed the analysis, SWPPP, unique resources, tree preservation, AUAR, <br />landscaping and recommendations. <br /> <br />Mr. Asleson commented that their AUAR calculations look reasonable at this <br />time. He stated that Rice Creek Watershed District has issued a conditional <br />approval. <br /> <br />It was recommended by the board that Mr. Asleson write a letter to the City of <br />Lino Lakes Engineer addressing the changes being made to the SWPPP. The <br />following are the changes/additions made to the SWPPP: <br /> <br />1. Page 4 of the Main Street Village SWPPP, the words “and city” should be <br />added after the bullet point that states “any dewatering discharge shall be <br />approved per the local LGU requirements. <br />2. Temporary storm ponds should located on the plan sheets <br />3. A method of dewatering turbid storm water from temporary storm ponds <br />should be detailed on the plan sheets and approved by the city. <br />4. Location of the SWPPP and weekly, post rain all event inspection sheets must <br />be located on site and indicated on the plan. <br />5. All infiltration areas must be protected from compaction and sequenced <br />correctly in order to protect the integrity of the stormwater feature. Protection <br />devices (fences) and sequence dialog must be shown on the plans. <br />6. Location of a clean out area for concrete trucks must be indicated on the plans <br />and clearly signed in the field. <br /> <br />The following changes/recommendations are made by the Environmental Board as of <br />November 28th, 2007: <br />1. All stormwater volume and flow designs must be evaluated for conformance <br />to RCWD and AUAR standards. <br />2. Site access for surface water treatment areas must be shown on the map. <br />3. Slopes of wetland mitigation areas be changed to conform to the AUAR. <br />4. Recommend 1-2 inch scraping the wetland soils in the freeze/thaw situation to <br />control reed canary grass. Also recommend the scraped soils in wetland fill areas be <br />salvaged and stockpiled for use in the wetland mitigation area. <br />2 DRAFT MINUTES
The URL can be used to link to this page
Your browser does not support the video tag.