My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11/13/2002 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2002
>
11/13/2002 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2014 3:22:34 PM
Creation date
6/6/2014 1:21:13 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
11/13/2002
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Jim Studenski, P.E. <br />• City of Lino Lakes <br />November 5, 2002 <br />Page 4 <br />• <br />• <br />berm. If this is the case, then easement documents need to be submitted to the City. Also, <br />rip -rap and an 8" PVC. storm outlet pipe along the westerly property line are shown on <br />property that is not on the development site. This would require an easement to be <br />submitted to the City. <br />3. MH with R -4342 casting and 8" PVC outlet located along the westerly development <br />property line. The 8" PVC is recommended to be changed to a 15" RCP with fixed end <br />section and set at the normal water elevation of 895.7 (instead of 895.00 shown on the <br />plans). That is, the outlet structure and pipe are recommended to be re- designed. <br />4. Provide stormwater calculations for the 2 -year design rainfall event, the 10 -year design <br />rainfall event and the 100 -year (revised) designed rainfall event. <br />5. Determine if 4" or 6" perforated draintile (or both) will be used on the project. Either <br />correct the plans and/or re- compute the stormwater runoff /routing calculations to match <br />the sizing. <br />6. Provide the City Engineer with literature and technical data describing the proposed "4- <br />inch Netlon Advanced turf' and "Netpave 50 backfilled with 3/8" clear- washed dresser <br />trap bit. admix rock" for review. There are concerns about permeability and bituminous <br />component of the Netpave regarding compaction over time. <br />7. Prior to construction commencement, provide the City Engineer with a completed copy <br />of the MPCA -NPDES permit.. <br />8. Regarding separation between groundwater elevation and the mostly westerly infiltration <br />basin base or finish elevation. Groundwater elevations have been established by two (2) <br />soil borings as described by a Braun Intertec Report (May 8, 2002). The groundwater <br />elevations were 890.5 and 892.5. These groundwater elevations provide greater than the <br />three (3) foot separation from all of the development site proposed basins or swales base <br />elevations. <br />It is also recommended that nearby private water supply wells be located for adjacent <br />properties to determine the proximity of the water wells to the stormwater system. The <br />location of the adjacent private wells along with well log information needs to be <br />provided to the City Engineer for his review. <br />9. Pretreatment features, such as basin slope geometry, ponding water depths and detention <br />time, length/width for ponds, swale slope and overflow issues have been addressed on the <br />revised plans. It is recommended that these plan items be accepted as shown. <br />
The URL can be used to link to this page
Your browser does not support the video tag.