Laserfiche WebLink
• <br />• <br />Planning & Zoning Board <br />UDOR Site Plan Review <br />November 13, 2002 <br />Grading/Drainage <br />City Engineer Jim Studenski has reviewed the submitted plans and reports that they <br />generally meet City requirements. The following two outstanding issues need to be <br />resolved, after which final approval can be given: <br />1. Drainage calculations must be submitted. <br />2. Documentation allowing access to the construction site from the adjacent site must be <br />submitted. <br />CONCLUSION <br />As the proposed addition appears to meet all requirements, staff would recommend <br />approval, with the following conditions: <br />1. Drainage calculations must be submitted prior to City Council review. <br />2. Documentation allowing access to the construction site from the adjacent site must be <br />submitted. <br />3. Silt fencing shall be staked at the top of the ponding area, rather than on the sides, to <br />prevent erosion. <br />4. No additional lighting is to be added without review. <br />5. Landscaping should be completed within one year of issuance of the building permit. <br />OPTIONS <br />1. Recommend approval of the proposed Site Plan Review, with conditions. <br />2. Recommend denial of the proposed Site Plan Review. <br />3. Return to staff with direction. <br />RECOMMENDATION <br />Option #1. <br />