My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/11/2014 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2014
>
06/11/2014 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 12:31:14 PM
Creation date
6/6/2014 4:10:01 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
06/11/2014
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
■ <br />WSB <br />engineering • planning • environmental • construction 701 Xenia Avenue South <br />Suite 300 <br />Minneapolis, MN 55416 <br />Tel: 763-541-4800 <br />Fax: 763-541-1700 <br />Memorandum <br />To: Katie Larsen, City Planner <br />From: Diane Hankee, PE <br />Date: June 6, 2014 <br />Re: Saddle Club PUD <br />Plan Review <br />WSB Project No. 2029-63 <br />We have completed a review of the revised grading and utility plans that were submitted for the <br />Saddle Club PUD in Lino Lakes, MN. <br />The following documents were provided for review: <br />• Revised preliminary grading and utility plans dated 5/21/14 by Plowe Engineering <br />Based on our review, we offer the following comments that should be addressed by the <br />applicant: <br />PROCEDURAL <br />1. Operation and Maintenance Agreement for stormwater management facilities will be <br />required. <br />2. The applicant must receive permits from other agencies prior to construction. Permits <br />needed include the MPCA's NPDES Construction Stormwater Permit and RCWD's <br />Stormwater Management and Erosion Control Permits. <br />GRADING PLAN <br />1. The outlet pipe for Pond 3 needs to be aligned so that it is not discharging into the <br />realigned ditch at a 90 degree angle. <br />STREET & UTILITY PLAN <br />1. As part of the construction plans, additional detail on how the locate wire is installed with <br />the watermain will be required. <br />St. Cloud • Minneapolis • St. Paul <br />Equal Opportunity Employer <br />wsbeng.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.