Laserfiche WebLink
• <br />• <br />AGENDA ITEM V.D <br />STAFF ORIGINATOR: Bob Kirmis (NAC) <br />P AND Z MEETING DATE: February 12, 2003 <br />TOPIC: Bruggeman Properties - Rezoning, Preliminary Plat, <br />Site & Building Plan Review and CUP (for <br />accessory drive - through) <br />BACKGROUND <br />Bruggeman Properties has requested preliminary plat approval to allow a three lot, commercial <br />subdivision on property located south of Birch Street and east of Hodgson Road. <br />The development site overlays 33.3 acres of land, 24.8 acres of which is to be reserved for future <br />medium density development (to be developed after the present residential development <br />moratorium is lifted) and lies within the shoreland overlay district of Baldwin Lake. <br />To accommodate the development proposal, the following approvals are necessary: <br />1. Rezoning of a portion of the property from R, Medium Density Residential to GB, <br />General Business/PDO (to allow private streets and multiple buildings on a single lot) <br />2. Preliminary Plat <br />3. Site and Building Plan for a 12,160 square foot retail center <br />4. CUP for an accessory drive - through facility (accessory to the retail center) <br />While detailed plans have not been submitted at this time, future plans for the site include a <br />motor fuel station (with accessory carwash), a fast food restaurant (with accessory drive - through) <br />and a 7,125 square foot office building /daycare facility. <br />This review is based on the following plan submittals: <br />Topographic Survey dated 1/13/03 <br />Preliminary Plat dated 1/13/03 <br />Grading Plan dated 1/13/03 <br />Utility Plan dated 1/13/03) <br />Site Plan dated 1/13/03 <br />Landscape Plan dated 1/13/03 <br />Lighting Plan dated 1/13/03 <br />Retail Center Floor Plan dated 1/13/03 <br />Retail Center building Elevations dated 1/13/03 <br />Environmental Board Comments dated 2/3/03 and 2/4/03 <br />CPTED Comments dated 1/21/03 <br />Applicant correspondence dated 1/30/03 <br />Anoka County Comments datedi 1 /20/02 <br />City Engineer Comments dated 2/4/02 <br />