Laserfiche WebLink
Bruggeman Properties <br />Page 3 of 13 <br />Hodgson Road. Recognizing this, the City has initiated a feasibility study as requested by the <br />applicant and the developer of the Spirit Hills project north of the subject site. The feasibility <br />study will examine traffic movements in the area and the need for a traffic signal at the <br />intersection. <br />Traffic related issues will need to be resolved prior to this development moving forward. <br />Lots. The GB District requires a minimum lot size of 20,000 square feet. While all proposed <br />lots exceed this requirement, it appears an error exists on the preliminary plat as the gross area of <br />Lot 2 (1.18 acres) is listed as being greater than that of Lot 1 (1.05 acres). This should be <br />corrected as a condition of preliminary plat approval. <br />At this time, it is the applicant's intention to develop the retail center upon Lot 1. Construction <br />of other site uses will occur at such time when detailed plans are developed. As demonstrated <br />via the submission of site plans, the configuration of the proposed lots are conducive to future <br />commercial development and the proposed uses. <br />Impervious Surface Coverage. As previously indicated, the subject site lies within the Baldwin <br />Lake Shoreland Overlay District. Within such district, the impervious surface coverage may not <br />exceed 60 percent of a lot. According to the submitted site plan, an impervious surface coverage <br />of 70 percent is proposed upon Lots 1 and 2 while a coverage of 52 percent has been proposed <br />for Lot 3. <br />As a condition of preliminary plat approval, impervious surface coverages must be reduced to <br />comply with the requirements of the shoreland ordinance. <br />It is the opinion of staff that revisions necessary to meet the maximum 60 percent coverage <br />requirement may result in significant modifications to the submitted site plan. In this regard, <br />staff feels that this item should be addressed before the Planning and Zoning Board take formal <br />action on the request. <br />Streets. The preliminary plat illustrates a street segment of approximately 400 feet in length <br />extending eastward from Hodgson Road. Future extension of the right -of -way dedication is <br />planned to occur at such time when Outlot A is developed. As a condition of subdivision <br />approval, a temporary cul -de -sac should be provided at the terminus of the roadway. <br />While public street access is technically being provided to all three commercial lots, access to the <br />retail building from the south is essentially provided via a private street. To accommodate such <br />private street, the processing of a PDO, Planned Development Overlay is necessary. <br />• As a condition of preliminary plat approval, all street - related recommendations of the attached <br />City Engineer's memorandum should be satisfied. <br />