Laserfiche WebLink
• <br />• <br />Century Farm North <br />Page 9 of 11 <br />Easements. The subdivision design is responsive to the 90' electrical easement and 60' gas <br />easement that traverse the property. As shown on the submitted plan, a trail has been proposed <br />within the electrical easement while airpark hangers border the gas easement in the southeast <br />corner of the property. <br />As shown on the preliminary plat, drainage and utility easements have been proposed along all <br />property lines and over wetland and ponding areas. The acceptability of such easements should <br />be subject to comment and recommendation by the City Engineer. <br />Carl Street Vacation. To accommodate the development proposal, the vacation of a portion of <br />Carl Street will be necessary. Such vacation will require a separate public hearing to be held by <br />the City Council. Issues associated with the street vacation should be subject to comment by the <br />City Engineer. <br />Utilities. A utility plan has been submitted for review by the City Engineer. As a condition of <br />preliminary plat approval, the utility related modifications and comments, as recommended by <br />the City Engineer in the attached memorandum should be incorporated into the plans. <br />Landscaping. As required by Ordinance, landscape plan has been submitted for review. The <br />plan calls for a series of overstory trees along the public streets and a combination of understory <br />and evergreen trees scattered throughout the site. Evergreen trees have been specifically <br />proposed in areas where screening is desired (i.e. between Century Trail and the airpark <br />hangers). <br />As a condition of PDO approval, the recommendations of the Environmental Board related to <br />landscaping (as documented in the attached memorandum dated 12/6/02) should be satisfied. <br />Grading and Drainage. A grading and drainage plan has been submitted for review by the City <br />Engineer. As a condition of preliminary plat approval, the grading and drainage related <br />modifications and comments, as recommended by the City Engineer in the attached <br />memorandum should to be incorporated into the plans. <br />The plan is also subject to review and approval from the Rice Creek Watershed District. <br />Environmental Issues. The Environmental Board reviewed the request at their December 5, <br />2002 meeting. <br />As a condition of PDO approval, the recommendations of the Environmental Board (as <br />documented in the attached memorandum dated 12/6/02) should be satisfied. <br />