My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/12/2003 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2003
>
02/12/2003 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2014 2:59:38 PM
Creation date
6/10/2014 9:31:48 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
02/12/2003
P&Z Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEB -05 -2003 12:44 <br />CITY OF LINO LAKES 651 982 2499 P.04/11 <br />Engineering Review Page 2 February 5, 2003 <br />Century Farms North <br />(1st -6th Additions) <br />and the cul -de -sac to the north of Century Trail and Pinto Lane have potential bury depth <br />issues for providing service to the adjacent homes. <br />E. The utility plans that our office has received do not show the connecting sanitary sewer piping <br />line work. The proposed sanitary manholes along with pipe size and slopes are shown. For <br />this reason, it is difficult to determine the sanitary sewer piping flow direction for Block 13, <br />14, and 15. <br />C. An overall engineering analysis for the proposed sanitary sewer system is recommended to be <br />undertaken that takes into account not only the Century Farms North subdivision; but also, <br />includes the future needs of currently undeveloped and adjacent unsewered areas. That is, <br />sanitary sewer system trunk and lateral lines along with pumping Aft station(s) need to be <br />sized, depth determined and alignments chosen with future use considered beyond the <br />subdivision boudaries. <br />D. Sanitary sewer system materials and installation methods shall follow the City of Lino Lakes <br />engineering standards. <br />E. Provide to the City of Lino Lakes a copy of the completed MPCA sanitary sewer permit. <br />F. Provide permanent easements for sanitary sewer system piping and components for utilities <br />not in the public right -of- -way. <br />2. Watermain System - Plan Sheets U1 and U1A through U1D: <br />A. Fire Hydrants shall be added at the watermain terminus for the east end of Stallion Road and <br />the north end of Century Trail for flushing purposes. <br />B. An overall engineering analysis for the proposed watermain system is recommended that <br />takes into account not only the Century Farm North subdivision; but also, the future <br />development needs of adjacent properties. <br />It would be expected that a watermain pipe will need to be installed parallel and near to <br />Sunset Road (CSAH #53) to address overall water system balancing and capacity <br />considerations. <br />C. Watermain system materials and installation methods shall follow City of Lino Lakes <br />engineering standards. <br />D. Provide to the City of Lino Lakes a copy of the completed MDH permit for watermain <br />installation. <br />E. Provide permanent easements for watermain piping and fire hydrants in locations not in the <br />public right -of -way. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.