My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03/12/2003 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2003
>
03/12/2003 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2014 4:20:02 PM
Creation date
6/11/2014 8:32:39 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
03/12/2003
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planning & Zoning Board <br />February 12, 2003 <br />Page 12 <br />DRAFT MINUTES <br />Wetlands. Three designated wetlands are located within the central area of the property <br />and comprise a significant portion of the site. Such wetlands are considered a site <br />amenity and obviously influence the configuration of the development. As required by <br />ordinance, a wetland mitigation plan has been submitted for review. <br />The proposed development is subject to Rice Creek Watershed District (RCWD) <br />approval. To date, comments from the District regarding the acceptability of the project <br />have not been received. The applicant is however, in the process of coordinating the <br />project with the Watershed District. To date however, the City has no information <br />regarding the Watershed District review. <br />To be noted is that the upland area of the site cannot be substantiated until such time as <br />the wetland areas have been verified by the Watershed District. <br />As a condition of PDO approval, all conditions imposed by the Watershed District must <br />be satisfied. <br />Greenways. The concept plan illustrates a series of interconnecting eight foot wide <br />bituminous trails. While the inclusion of the trails in considered positive, it would seem <br />appropriate to extend the east/west trail segment beneath the power easement to the west <br />to connect to Sunset Road. The acceptability of the trailways in fulfilling the greenway <br />directive of the Comprehensive Plan should be subject to comment and recommendation <br />by the Park Board. <br />Park Dedication. As shown on the Parks /Open Space Plan, a significant portion of the <br />subject property is to be dedicated as public park land. Specifically, the concept plan <br />provides 22.5 acres of gross public park land, 7.3 acres of which is contiguous upland. <br />To be noted is that the upland acres of parkland cannot be substantiated until such time as <br />the wetland areas have been verified by the Watershed District. <br />The integration of such park areas responds to a specific directive of the Comprehensive <br />Plan of providing a greenway in the area. While the inclusion of such park land is <br />considered positive, an assurance should be made that problems do not result from the <br />combination of private and public park ownership. Of specific concern is that the <br />primary east/west trailway through the property be available to all park users (regardless <br />of private and public ownership). <br />Tree Preservation. According to the applicant, a significant amount of existing tree <br />massings in the southern portion of the site are to be preserved. While the existing <br />conditions map identifies generalized tree massings, a specific tree inventory has not, to <br />date, been submitted. <br />The Subdivision Ordinance does not specifically mandate the submission of a tree <br />inventory, nor has the Environmental Board requested such a submission. <br />Easements. The subdivision design is responsive to the 90' electrical easement and 60' <br />gas easement that traverse the property. As shown on the submitted plan, a trail has been <br />DRAFT MINUTES <br />
The URL can be used to link to this page
Your browser does not support the video tag.