My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03/12/2003 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2003
>
03/12/2003 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2014 4:20:02 PM
Creation date
6/11/2014 8:32:39 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
03/12/2003
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />Planning & Zoning Board <br />February 12, 2003 <br />Page 29 <br />DRAFT MINUTES <br />Birch Street/Hodgson Road Intersection. Obviously, the proposed development will <br />affect area traffic patterns and escalate volumes encountered at the intersection of Birch <br />Street and Hodgson Road. Recognizing this, the City has initiated a feasibility study as <br />requested by the applicant and the developer of the Spirit Hills project north of the <br />subject site. The feasibility study will examine traffic movements in the area and the <br />need for a traffic signal at the intersection. <br />Traffic related issues will need to be resolved prior to this development moving forward. <br />Lots. The GB District requires a minimum lot size of 20,000 square feet. While all <br />proposed lots exceed this requirement, it appears an error exists on the preliminary plat <br />as the gross area of Lot 2 (1.18 acres) is listed as being greater than that of Lot 1 (1.05 <br />acres). This should be corrected as a condition of preliminary plat approval. <br />At this time, it is the applicant's intention to develop the retail center upon Lot 1. <br />Construction of other site uses will occur at such time when detailed plans are developed. <br />As demonstrated via the submission of site plans, the configuration of the proposed lots <br />are conducive to future commercial development and the proposed uses. <br />Impervious Surface Coverage. As previously indicated, the subject site lies within the <br />Baldwin Lake Shoreland Overlay District. Within such district, the impervious surface <br />coverage may not exceed 60 percent of a lot. According to the submitted site plan, an <br />impervious surface coverage of 70 percent is proposed upon Lots 1 and 2 while a <br />coverage of 52 percent has been proposed for Lot 3. <br />As a condition of preliminary plat approval, impervious surface coverages must be <br />reduced to comply with the requirements of the shoreland ordinance. <br />It is the opinion of staff that revisions necessary to meet the maximum 60 percent <br />coverage requirement may result in significant modifications to the submitted site plan. <br />In this regard, staff feels that this item should be addressed before the Planning and <br />Zoning Board take formal action on the request. <br />Streets. The preliminary plat illustrates a street segment of approximately 400 feet in <br />length extending eastward from Hodgson Road. Future extension of the right -of -way <br />dedication is planned to occur at such time when Outlot A is developed. As a condition <br />of subdivision approval, a temporary cul -de -sac should be provided at the terminus of the <br />roadway. <br />While public street access is technically being provided to all three commercial lots, <br />access to the retail building from the south is essentially provided via a private street. To <br />accommodate such private street, the processing of a PDO, Planned Development <br />Overlay is necessary. <br />• As a condition of preliminary plat approval, all street - related recommendations of the <br />attached City Engineer's memorandum should be satisfied. <br />DRAFT MINUTES <br />
The URL can be used to link to this page
Your browser does not support the video tag.