My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/14/2003 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2003
>
05/14/2003 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2014 5:00:13 PM
Creation date
6/11/2014 9:39:49 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
05/14/2003
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />Molin <br />May 14, 2003 <br />page 3 <br />and shrub planting on the berm to the north of the property, as well as native seed <br />planting around the pond located north of the berm. <br />Because of the wet weather last summer, excavation and landscaping were delayed on the <br />northern portion of the Molin site. Molin did notify City staff of this problem last year. <br />Staff visited the site on May 2nd to view progress. The landscaping plan is being <br />implemented properly, according to the approved planting plan. Some acceptable <br />substitution of a few individual plantings has occurred. Molin has almost completed <br />construction of the swale and pond through the property. When they are finished, <br />landscaping can be completed. <br />RECOMMENDATION <br />Staff recommends approving the CUP amendment with the following conditions: <br />1. The City Engineer's comments in the May 6, 2003 TKDA memo must be satisfied. <br />2. Exterior lighting fixtures shall be hooded and directed to reflect light away from <br />neighboring residential properties and rights -of -way. The fixtures must have a 90 <br />degree cut off angle. <br />3. All conditions in Resolution 01 -182 continue to apply. <br />This report is based on architectural and structural plans received April 8, 2003; <br />preliminary grading plan, photometric plan, and lighting fixture cut sheets received April <br />21, 2003. <br />
The URL can be used to link to this page
Your browser does not support the video tag.