My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/09/2003 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2003
>
07/09/2003 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2014 3:57:07 PM
Creation date
6/11/2014 10:09:51 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
07/09/2003
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TKDA <br />• ENGINEERS • ARCHITECTS • PLANNERS <br />MEMORANDUM <br />To: James Studenski, City Engineer Reference: Discount Tire <br />1500 Piper Jaffray Plaza <br />444 Cedar Street <br />Saint Paul, MN 55101 -2140 <br />(651) 292 -4400 <br />(651) 292 -0083 Fax <br />www.tkda.com <br />Copies To: Lino Lakes Marketplace <br />From: Scott A. Brink <br />Date: June 25, 2003 <br />City of Lino Lakes, Minnesota <br />Comm. No. 12701 -002 <br />Routing: <br />I have included with this review a Review Memorandum for this development dated May 6, 2003, along with <br />the following documents: <br />Full Size and Reduced Size Plan Sets, Sheets Cl -05, Ll, Al, and A2, Westwood Professional <br />Services, dated June 7, 2003. <br />•The majority of items and issues mentioned in the previous memorandum have been addressed, however, <br />please note the following: <br />1. The project site is located adjacent to the east side of Lake Drive (CSAH 23), just north of I -35W. <br />The plans indicate that there will be very little or no work within the CSAH 23 right -of -way. <br />However, if any type of temporary access or work activities occur within the right -of -way, review <br />and approval of Anoka County will be required. Any work within the County right -of -way requires a <br />permit from the County. The Developer shall be responsible for attaining said permit and adhering to <br />any other conditions of the County as may be required. <br />2. The Contractor shall adhere to working hours for construction activities in accordance with the <br />requirements of the City of Lino Lakes. <br />3. Sanitary sewer service pipe shall be SDR 26 or SCH 40 and ductile iron water pipe shall be CL 52. <br />Gate Valves shall be Mueller A- 2370 -20 with mechanical joints, meeting AWWA Specifications <br />C500 -61. Valve Boxes shall be Mueller H -10357 with H -10361 drop lid and extensions shall be <br />Mueller H- 10363. <br />4. Autumn Blaze Maples are proposed adjacent to the Dairy Queen property, which also proposes <br />Autumn Blaze Maples at the same location. It is recommended that the two properties coordinate <br />landscape and construction activities accordingly. <br />An Employee Owned Company Promoting Affirmative Action and Equal Opportunity <br />
The URL can be used to link to this page
Your browser does not support the video tag.