Laserfiche WebLink
• <br />• <br />• <br />Bruggeman <br />page 8 <br />The front facades include vinyl siding and stone veneer with vinyl shakes on gable ends. <br />The sides and rears have no stone, and the sides have only vinyl siding. The zoning <br />ordinance requires 25% of the combined area of all facades of a structure to be brick, <br />stucco, and/or natural or artificial stone. No single building facade shall have more than <br />75% of one type of exterior finish, except for brick, stucco, or stone. The structures do <br />not meet these requirements. <br />Townhomes without basements must have garages of 540 sf. The floor plans indicate <br />that the garages do not meet this requirement. <br />As with all townhome developments, a homeowners' association will be needed. By <br />laws must be reviewed by the City Attorney prior to final plat consideration. <br />Commercial: The commercial building exterior includes a stone base, painted "hardi- <br />plank" lap siding, vinyl shakes on the gable ends, and prehung vinyl windows. <br />Decorative painted wood columns and a small trellis along the roof line add some detail. <br />The materials generally match those proposed for the residential structures. <br />A painted wood sign band should be changed to something more attractive: perhaps <br />stucco. A signage plan must be worked out, similar to the signage plan for the <br />development across the street. <br />Shoreland: The western portion of the site is within 1000' of the ordinary high water <br />level of Baldwin Lake, which puts it in the shoreland overlay. The issue here is <br />impervious surface. For commercial development in a shoreland, the impervious <br />maximum is 60 %. The commercial area is 59% impervious. The residential maximum is <br />35 %, and the residential area within the shoreland is 30 %. <br />Streets: One important criteria for new development is whether or not the project <br />is premature due to inadequate transportation infrastructure. If the infrastructure is <br />inadequate, it must be improved to ensure it can accommodate the new development. As <br />explained here, major improvements to the surrounding roadways are necessary to <br />accommodate the project. These improvements would occur with the project. The <br />improvements would serve to correct an undesirable pre- existing situation as well. <br />Site Access Points: The plan includes three accesses to surrounding roadways: <br />• A full access to Hodgson Rd. is located on the southern portion of the site, just north <br />of the wetland and proposed pond. <br />• A right -in, right -out access to Birch St. will be created on the north side of the project <br />site. This access is approximately half way between Hodgson and Ware Roads, <br />minimizing conflict as much as possible. <br />• A full access to Ware Rd. on the east side will align with Arrowhead Drive, creating a <br />complete 4 -way intersection. This is a positive design element as it utilizes the <br />location of an existing access point rather than creating another one. The spacing is <br />good, approximately 1/4 mile from Birch St. <br />