My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/13/2003 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2003
>
08/13/2003 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2014 3:38:28 PM
Creation date
6/11/2014 12:01:33 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
08/13/2003
P&Z Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />AGENDA ITEM 5D <br />STAFF ORIGINATOR: Michael Grochala <br />P & Z MEETING DATE: August 13, 2003 <br />TOPIC: Preliminary Plat for Marshan Lake <br />Industrial Park (Lakes Business Park) <br />ACTION REQUIRED: 3/5 vote <br />BACKGROUND <br />The applicant, Glenn Rehbein, is requesting Preliminary Plat approval for a four lot <br />subdivision, to be sited on 30.6 acres of land for the purposes of developing an industrial <br />park. The property is located northeast of Blue Heron Elementary School and west of <br />Lake Drive. This property is guided for Industrial Use, zoned LI -Light Industrial, and is <br />located within the existing MUSA area. <br />This review is based on the most current submittal, consisting of the following plans: <br />• • Marshan Lakes Industrial Park: <br />1. Certificate of Survey, received 7- 14 -03. <br />2. Preliminary Plat, received 7- 14 -03. <br />3. Tree Inventory Plan, dated 7- 11 -03. <br />4. Tree Preservation Plan, dated 7- 11 -03. <br />5. Grading, Drainage & Erosion Control Plan, dated 7- 11 -03. <br />6. Utility Plan, dated 7- 11 -03. <br />• Panattoni Site: <br />1. Site Plan, dated 7- 11 -03. <br />2. "Build to Suit" Site Plans (P -1, A2.0 -.1, A5.0, El, L1 -2), dated 7- 11 -03. <br />ANALYSIS <br />Project Data: <br />• <br />Total Site Area: <br />Upland Area: <br />Number of Lots: <br />30.6 acres <br />28.1 acres <br />4 lots <br />
The URL can be used to link to this page
Your browser does not support the video tag.