Laserfiche WebLink
• <br />• <br />• <br />Eagle Brook Church <br />page 5 <br />11. The church shall enter into a maintenance agreement for the stormwater facilities prior to <br />issuance of a building permit. <br />12. A management plan for the prairie areas must be prepared and obtain approval from the City <br />prior to building permit issueance. <br />13. Traffic control personnel shall be employed during peak periods at the I -35E interchange, at <br />the 20th Ave. and Main St. intersection, and at the access driveways to the site. These <br />personnel shall be law enforcement officers. <br />14. During church services and large events, the northern driveway shall be entry only and the <br />south driveway shall be exit only. Traffic control personnel shall be present at the driveways <br />to assure this. <br />15. Parking lot lighting shall be turned off no later than two hours after services or other events <br />at night. <br />16. The terms and dimensions of the conservation easement in the southwest portion of the site <br />must be agreed to by the church and the easement holder prior to issuance of a building <br />pe�niit. <br />17. The sewer line from the building line to the septic tanks must be insulated to prevent <br />freezing. <br />18. A fence or other barrier shall be built to protect the septic system treatment areas. <br />19. Street lights typical for road intersections shall be installed at the church's cost at the end of <br />each access driveway on CSAH 21 (20th Ave.). <br />OPTIONS <br />1. Approve the preliminary plat subject to the conditions listed. <br />2. Approve the conditional use permit subject to the conditions listed. <br />3. Deny the applications. <br />RECOMMENDATION <br />Options 1 and 2 <br />This report is based on information submitted December 18, 2004 <br />