Laserfiche WebLink
Oakwood View Page 3 February 26, 2004 <br />City of Lino Lakes, Minnesota <br />Utilities <br />1. It is proposed to extend sanitary sewer and water south from existing facilities at the current <br />termination point at Oakwood Lane. At this location, existing sanitary sewer and water are shown <br />extending south along the west property line to the existing church building. 'It is proposed to <br />abandon these lines and replace them with lines extending southeasterly down the new Oakwood <br />Lane street extension, and then continuing those lines southwesterly and southerly back to the church <br />facility. The new lines would then be extended southeasterly to serve both the existing church and <br />new enabling facility. It is recommended that any lines to be abandoned that are located beneath <br />proposed structures be removed in their entirety. <br />2. The existing watermain appears to be a very long dead end line. With the extension to the enabling <br />facility, the long length raises at least some concern with regards to adequate pressures and <br />circulation. It is suggested that any options to loop the pipe by way of County Road J be explored <br />with the City. Additional utility easements for the extensions would be required. In addition, the <br />sewer and water extensions to the enabling facility as shown cross beneath existing and proposed <br />wetland and detention areas where minimum cover (8 feet) over the pipes will be compromised. <br />Insulation over the pipes will be required in such instances. Also, infiltration into the sanitary sewer <br />under the wetland/pond areas may be of concern, and it is suggested that the sewer be constructed to <br />watermain tightness standards at that location. <br />3. The Plan shall be subject to the review of the City Fire Chief, including the number and location of <br />hydrants. It is recommended that additional hydrants be added near the church and enabling facility. <br />4. Individual services for the proposed units on Oakwood Lane and for the church facilities must be <br />shown on the plan. It is presumed that the existing church is already serviced by the existing sanitary <br />sewer and water, and that the services will be re- connected to the newly installed mains. <br />5. A detail sheet shall be provided showing the Standard plates and details of the City of Lino Lakes. <br />This would include manhole structures, utilities (hydrants, valves, services, etc.), and storm drain and <br />erosion control details. <br />6. As previously stated the amount of filUcover over all sewer and water service pipes shall be a <br />minimum bury depth of 8 feet, and shall be insulated per City of Lino Lakes standards if the <br />minimum cover cannot be attained. <br />7. All trenches (including services) shall be backfilled and compacted and meet 1 00% maximum <br />Standard Proctor Density in the upper 3 -feet from finished road elevation, and 95% maximum <br />Standard Proctor Density below the upper 3 -feet. <br />8. A minimum of two feet of cover over storm sewer pipe is desired. <br />