Laserfiche WebLink
Chard, <br />Hokanson Development, Inc. <br />9174 latent) Street N.E. <br />Blaine MN. 55434 <br />(7631 786 -3130 <br />I hereby certify that this plan was prepared by me or under <br />my direct supervision and that I am a licensed Professional <br />Engineer under the laws of the Slate of Minnesota. <br />Kenneth Adolf <br />Date: 5/05/04 Reg No <br />Of <br />12045 <br />Project NameILoeaSorr <br />Manahan Townhomes <br />2nd Addtlon <br />Lino Lakes, Minnesota <br />Dale <br />5/05/04 <br />0 i 30 60'-•...,-• , n 90,� �, <br />SCALE N 1FCtl- yv.;' <br />EROSION CONTROL <br />FENC <br />4 <br />Jr 6gr r <br />l,, p l r <br />/poi_ "ti..'(� <br />-- -/w, / S% 1 v / TREE PROTECTION +. xy� .....r <br />; / 40 , ', FENCE TYP. i f <br />�, / 1 � O <br />a <br />/;=` / j r' ` p oi ' l <br />1 p EXISTING BUILDINGS <br />I OO TO BE DEMOLISHED <br />/ J_-' / t4 <br />,, • • r. \ 0 .. <br />/ f -'- ` l a EROSION CONTROL <br />■ I �-. .� ❑ FENCE <br />/ / V / 19 '. <br />f t �� D \ fit. <br />\f\ , p o ab • <br />1� `` r' 00000...ti- ©t <br />,(\I `gyp o <br />-` -- r- -0. ff` <br />1 <br />4,,E <br />�� _.. B6 <br />eI < <br />�f <br />mot; <br />ii $ <br />(:I <br />pc <br />CONCRET VALLEY EROSION CONTROL <br />o i GUTTER FENCE t <br />I WARNING , <br />THE' CONTRACTOR SHALL CONTACT ALL PUBLIC UTILITIES <br />FOR LOCATIONS OF At). UNDERGROUND ykjIRES, CABLES:. <br />CONDUITS. PIPES. MA &fQA, VALVES, 0 OTHER BURIED <br />STRUOTURES BEFORE DIGGING, HE SHALL REPAIR OR :: <br />REPLACE THE ABOVE WHE, DAMAGED! DURING <br />1 CONSTRUCTION AT NO COST TO 0 NER. 1 <br />ROCK CONSTRUCTION <br />ENTRANCE <br />is <br />CONCRETE VALLEY <br />GUTTER <br />I <br />t 7 <br />(30000 <br />raTfraM <br />to - <br />_ <br />oti000'oa0ao ©do❑ <br />O 1 <br />0 <br />0 <br />O <br />D <br />9 <br />GRADING NOTES `L$[*LT \ <br />12. FMISRED„CROUN A 00 ELEVATION ADJA 0 BUILDING S <br />BELOW FLOOR , .EV*I1 N. SLOAl i�ROUND AWAY ROM„BUILDING A M <br />OF 6- IN 10 FEET'"BEY„OND 10 REFER TO PLAN GRADES..,L. <br />13. CONTRCC • RESPONSIBLETOR,G_�ADtNG AD SLOPING,. FINISHED " <br />GROUND - � 1 E, J PROVIDE SMObOTH-.dc"UNIFQRM SLOE WHICH PROVIDE'' -. "" <br />POSITIVE a-- OM BUILDINGS ANO...QREVEN AIDING IN LOWER <br />^-- ..,"AREAS. CONTACY." "f r ELD ADJUSTMENTS _ QINC PL�ARE "` "`"• <br />REouIS D. "K.'d "••..,,;� <br />14. CONTRAC"TOOR„ RESPONSIBLE FOR C STRUCTION, PAVEMENTS AND CARE , e <br />AND GUTTER WITH SMOG-Tit UNIFORM SLOPES WHICH fj W'4DJc POSITIVE <br />UIRED. <br />901. <br />901.0 <br />14 <br />901.'1 <br />901.7 <br />rn <br />DRAINAGE. CONTACT ARCHITECT IF FIELD ADJUSTME <br />15.- NSTA(:E-A- MINIMUM, OF,-4-INCHES-CLASS- B's_AG REGA-FE-BASE Uhl <br />AND GUTTER. <br />LEGEND <br />DENOTES BOUNDARY LINE <br />DENOTES DRAINAGE/ UTILITY EASEMENT <br />DENOTES EXISTING STORM SEWER <br />DENOTES EXISTING WATERMAIN <br />DENOTES EXISTING SANITARY SEWER <br />DE,NQTES EXISTING BUILDING <br />DENOTE' <br /><K <br />o a <br />O <br />DENOTES <br />PR <br />SED BUILDING <br />T ' STORM MANHOLE/ CB <br />DENOTES EXISTING SANITARY MAP* <br />DENOTES EXISTING HYDRANT L.. <br />RB-- <br />g <br />0 <br />4 <br />F/ 901.7 <br />998- --- - EXISTIN v0NTOUR • -`�,.. • ' ` „ "+ <br />o „_ <br />3iY" <br />79Q,.„ -Y PROPOSAE Oy: „ Y .` • . ` .. <br />- 0000090D00ECV- EROSION CONTROL 5 FENCE ` ~���9:;� <br />0'0-0-0- a-a-a'rra-a-a-a <br />iaaaaaaad.�.aya. <br />1.00E <br />x 910.5 <br />/ 7-7 rGF\SOG <br />PROPOSED-"ROCK CONSTRUCTION ENTRANCE <br />PERCENT OF RADE +~` <br />PERCENT OFCRADE <br />PROPOSED /POT ELEVATION <br />RB CUT CONSTRUCTION. SAWCUT <br />BITUMINOUS FOR CURB AND GUTTER REMOVALS. <br />RESTORE ,STREET TO MATCH EXISTING PAVEMENT <br />SECTION./ . <br />DENOTE SLAB ON GRADE <br />DENOTES GARAGE FLOOR (ELEVATION) <br />"-, ,� "''._' ",`' - ”bag"^..,. <br />• " O <br />it <br />4 I <br />EROSION CONTROL NOTES <br />1. ALL PERIMETER SILT FENCE AND ROCK CONSTRUCTION ENTRANCES SHALL BE <br />INSTALLED PRIOR TO CONSTRUCTION. <br />2. THE CONTRACTOR SHALL CONSTRUCT DRAINAGE BASINS PRIOR TO SITE <br />GRADING. <br />3. THE CONTRACTOR SHALL GRADE SITE AND INSTALL UTILITIES. <br />4. WITHIN TWO WEEKS OF SITE GRADING. ALL DISTURBED AREAS SHALL BE <br />STABILIZED WITH SEED. SOD OR ROCK BASE. REFER TO LANDSCAPE PLANS FOR <br />MATERIALS. <br />5. ALL EROSION CONTROL MEASURES SHALL BE INSTALLED AND MAINTAINED IN <br />ACCORDANCE WITH CITY, AND WATERSHED DISTRICT PERMITS <br />6. THE CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL MEASURES. <br />INCLUDING THE REMOVAL OF ACCUMULATED SILT IN FRONT OF SILT FENCES <br />DURING THE DURATION OF THE CONSTRUCTION. <br />7. ANY EXCESS SEDIMENT IN PROPOSED BASINS SHALL BE REMOVED BY THE <br />CONTRACTOR. <br />B. REMOVE ALL EROSION CONTROL MEASURES AFTER VEGETATION IS ESTABLISHED. <br />9. THE CONTRACTOR SHALL REMOVE ALL SOILS AND SEDIMENT TRACKED ONTO <br />EXISTING STREETS AND PAVED AREAS. <br />• <br />10. IF BLOWING DUST BECOMES A NUISANCE, THE CONTRACTOR SHALL APPLY <br />WATER FR0M A TANK TRUCK TO ALL CONSTRUCTION AREAS <br />11. SWEEP ADJACENT STREET IN ACCORDANCE WITH CITY REOUIREMENTS. <br />EROSION & SEDIMENT CONTROL MAINTENANCE: <br />1. INSPECT SILT FENCES AFTER EACH RAINFALL AND AT LEAST <br />DAILY DURING PROLONGED RAINFALL. IMMEDIATELY REPAIR FAILED <br />OR FAILING FENCES. <br />2. REPLACEMENT - FABRIC SHALL BE REPLACED PROMPTLY WHEN <br />IT DECOMPOSES OR BECOMES INEFFECTIVE BEFORE THE BARRIEFUS___„_„. <br />NO LONGER NECESSARY. <br />3. SEDIMENT REMOVAL - SEDIMENT DEPOSITS 171 ' ' ••••▪ EI 9 ED <br />SHALL BE REMOVED AFTER EACH STORM EVENT. <br />4. ANY SEDIMENT REMAINING IN PLACE AFTER THE <br />SILT FENCE OR FILTER FABRIC IS NO LONGER <br />REOUIRED SHALL BE GRADED TO CONFORM WITH <br />THE EXISTING GRADE, PREPARED, AND SEEDED WITH <br />THE APPROPRIATE SEED MIX AS DIRECTED BY THE <br />OWNER. <br />MAY 0 7 2004 <br />OF LINO <br />GRADING NOTES: <br />1. CONTRACTOR SHALL CONTACT 'GOPHER STATE ONE CALL' WITHIN TWO WORKING <br />DAYS PRIOR TO EXCAVATION/ CONSTRUCTION, FOR UTILITY LOCATIONS. TWIN <br />CITIES METRO AREA: 651- 454 -0002 OR TOLL -FREE: 1- 800 - 252 -1166. <br />2. CONTRACTOR SHALL FIELD VERIFY THE LOCATIONS AND ELEVATIONS OF <br />EXISTING UTILITIES AND TOPOGRAPHIC FEATURES PRIOR TO START OF SITE <br />GRADING. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE PROJECT <br />ENGINEER OF ANY DISCREPANCIES OR VARIATIONS. <br />3. SUITABLE GRADING MATERIAL SHALL CONSIST OF ALL SOIL ENCOUNTERED ON <br />THE SITE WITH EXCEPTION OF TOPSOIL, DEBRIS, ORGANIC MATERIAL AND <br />OTHER UNSTABLE MATERIAL. STOCKPILE TOPSOIL AND GRANULAR FILL AT <br />LOCATIONS DIRECTED BY CONTRACTOR. <br />4. SUBGRADE EXCAVATION SHALL BE BACKFILLED IMMEDIATELY AFTER EXCAVATION <br />TO HELP OFFSET ANY STABILITY PROBLEMS DUE TO WATER SEEPAGE OR <br />STEEP SLOPES. WHEN PLACING NEW SURFACE MATERIAL ADJACENT TO <br />EXISTING PAVEMENT. THE EXCAVATION SHALL BE BACKFILLED PROMPTLY TO <br />AVOID UNDERMINING OF THE EXISTING PAVEMENT. <br />5. CONTRACTOR SHALL E8E RESPONSIBLE FOR ALL HORIZONTAL AND VERTICAL <br />CONTROL. <br />6. GRADES SHOWN ARE FINISHED GRADES. CONTRACTOR SHALL ROUGH GRADE TO <br />SUBGRADE ELEVATION, LEAVE STREET READY FOR SUBBASE. <br />7. ALL EXCESS MATERIAL, BITUMINOUS SURFACING. CONCRETE ITEMS, ANY <br />ABANDONED UTILITY ITEMS, AND OTHER UNSTABLE MATERIALS SHALL BECOME <br />THE PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OFF THE <br />CONSTRUCTION SITE. <br />8. COMPLETION OF SITE GRADING OPERATIONS SHALL RESULT IN ALL AREAS BEING <br />GRADED TO 'PLAN SUBGRADE ELEVATION'. BUILDING PAD AREAS SHALL BE <br />DETERMINED BY REFERRING TO THE ARCHITECTURAL DRAWINGS. THE PARKING <br />LOT AND DRIVEWAY AREAS SHALL BE DETERMINED BY REFERRING TO THE SITE <br />PLAN AND PAVEMENT SECTION DETAILS FOR LOCATION AND LIMITS OF <br />BITUMINOUS PAVEMENT SECTIONS. <br />9. REFER TO THE ARCHITECT'S SITE PLAN FOR MOST CURRENT HORIZONTAL <br />DIMENSIONS AND SITE LAYOUT. <br />_ - 10. REFER TO UTILITY PLAN FOR SANITARY SEWER MAIN. WATER MAIN SERVICE <br />LAYOUT AND ELEVATIONS AND CASTING AND STRUCTURE SCHEDULE. <br />11. THE MINIMUM GRADED SLOPE FROM EDGE OF BUILDING SHALL BE 6 INCHES <br />•jt` IN 10 FEET. <br />Revisions <br />Date: Description: <br />5/05/04 <br />REVISED PLAT <br />By: Date: Description: <br />DFD <br />By <br />Designed By <br />KA <br />Drown By <br />OFD <br />Checked By <br />KA <br />Schoell & Madson, Inc. <br />Engineering • Surveying • Planning <br />Soil Testing • Environmental Services <br />WWW.schoeknedaoncom <br />110580 Wayzata Bo.Kaverd. We 1 554 Thrd Street NW, Sate 100 <br />MmeaPota Mtneaola 55305-1525 Ek River, Minnesota 55330 -1409 <br />phone (952) 546 -7601- far (952) 546 -9065 phone (763) 241-0108 - lax, (952) 546 -9065 <br />Sheet Tdle <br />GRADING, DRAINAGE AND <br />EROSION CONTROL PLAN <br />Steep <br />511 <br />SMI Project Number: 63506 -004 <br />KES <br />• <br />ti <br />a <br />410 <br />0 <br />v <br />Z <br />w_ <br />LL <br />