Laserfiche WebLink
• <br />• <br />• <br />Marshan Townhomes 2" d Addn. <br />page 8 <br />ENVIRONMENTAL BOARD <br />The Environmental Board reviewed the application on May 26th. The comments are <br />attached. Changes to species that were not done on the July 30 landscaping plan are <br />included in the conditions of approval. Inspection of imported soils is required by <br />development agreements. Irrigating the sod areas is listed in notes on the landscaping <br />plan. <br />CONDITIONS OF APPROVAL <br />The following conditions should be attached to any approval of the project: <br />1. Additional right of way shall be dedicated to Anoka County to total 60 feet from <br />centerline for Lake Drive (CSAH 23). <br />2. Right of access shall be dedicated to Anoka County along CSAH 23 on the final <br />plat. <br />3. A new landscaping plan shall be submitted with the following changes three <br />weeks prior to City Council consideration of the application: <br />- change Colorado spruce to white spruce <br />4. The final plat must include larger individual unit lots to ensure that the eaves and <br />any building projection meets the property line separation to meet fire protection <br />requirements in the building code. <br />5. A revised preliminary utility plan and preliminary grading must be prepared and <br />submitted three weeks prior to City Council consideration of the application. The <br />previous submittals are void due to the revised layout of the project. The City <br />Engineer's comments in the July 9, 2004 memo and the August 6 memo must be <br />met to his satisfaction. <br />6. Park dedication shall be $28,170. <br />7. Existing buildings on the site shall be removed. <br />8. The existing well and onsite septic system shall be properly abandoned. <br />9. Brick veneer base shall be included on all four sides of the buildings. <br />10. The project shall not be final platted until 2005 to comply with the growth <br />management policy. <br />