500'33'33 "E
<br />,, OW Ca: XpeT
<br />SE v< 109
<br />reo- wes,
<br />es...„..e ' ''''''' :7'2% .77 1■1,,
<br />.-. ......- . .... — ... -- .....— —..... — ......... .....
<br />/
<br />- --;;;;;;-;•01:,--4.6,--.743i,,T-r,--i;707•4,.-4,V171' 77447"'"""------1:'-----------''''"'------ n'''''--'-----'"---------"-"7-------
<br />:c 1 • /
<br />N89,58'28"W .ar 377.07 /
<br />0
<br />APPROkusA c0Cers919
<br />ries-sway,: PCR AMPPItiC &Fsee:48.:2 kasfiAar: BIRCH STREET
<br />LaTuSWAga,=.2 PAN
<br />t'jra .4.Nt2K A ;YAW 1, .>i WAY 4, ,
<br />Ri5J f r - C.,/ - WAY PO, ka 4' ,.. i
<br />—--7
<br />— 1— 0
<br />k•-•
<br />e r \
<br />• SILT FENCE \
<br />(C.S.AH. NO. 10 )
<br />90,
<br />&NCH MAIO.
<br />5
<br />/01:0
<br />)7.619 sr
<br />C/A/Cr
<br />40E4905.5
<br />BFEw=897.5
<br />_904
<br />900
<br />97.50
<br />0100
<br />ooso 909i
<br />.904.00
<br />4,4
<br />4440.41440491", ' OF
<br />f.ak 4440 04aiE400414
<br />AZAPAWL.
<br />St V' Pet
<br />N
<br />65010 ENTRANCE PAD tait...^T,Vc- i=40,=
<br />.—..... ...,,,,,T
<br />{',.. ,'
<br />irE.,
<br />1 c,,,, tt■ta,
<br />(41'
<br />05 50
<br />460.905,5
<br />SFEw897.5
<br />905.50
<br />9043'
<br />1*.T.`t:
<br />904—.-.
<br />900
<br />898
<br />ff:
<br />la' 4 ," -e
<br />"e
<br />• /•
<br />=
<br />CA.?
<br />660.897,5
<br />es
<br />■
<br />cxemeo CIvlL 100060
<br />":"ro.79:
<br />Ege
<br />4.. POST INDIlTOR VALVE
<br />Ms-
<br />LIGNI POLE
<br />POWER POLE
<br />RENCWONs
<br />SC, WRINGS
<br />WATER MANHOLE
<br />TELEPHONE MANHOLE
<br />SlwilLAI:=1.,EANNOLE
<br />ELECTRIC MANHOLE
<br />sANITARY SERVICE
<br />HANDICAP PAW..
<br />DIRECTION Of FL.
<br />SPOT SLEW.
<br />CORTOLMS
<br />SAWIA. SEwER
<br />STORD SEWER
<br />°RCM.
<br />ON.TILE
<br />5,7 FENCE
<br />Die & WIEN
<br />RUMS. wALL
<br />!RM.
<br />USEmENT UNC
<br />...Cs
<br />Mal LINE
<br />litiaRGROIA0 Tot
<br />UNDERGROUND GAS
<br />OVERHEAD moose
<br />GRADING, DRAINAGE & EROSION CONTROL NOTES
<br />The coMroctor shoe refer to the architectural plons for exact locations and
<br />dimensions of buildings, vestibules, sloped paving. exit porches, rornps, truck docks,
<br />entry locations and locations of downspouts.
<br />2. All disturbed unpovecl oreos ore to receive minimum of 4 inches of top soil and
<br />sod or seed. These oreos shall be watered by the contractor until the sod or seed
<br />is growing in o healthy manner.
<br />3. The contractor sholl take all precoutions necessary to ovoid property domage to
<br />adjocent properties during the construction phase of this project. The contractor
<br />*RI be held responsible for any don-loges to adjocent properties occurring during
<br />the construction phase of this project.
<br />4. The controctor will be responsible for providing and rnointaining trolfic control
<br />devices such os barricades, worMng signs, directional signs, flogrnen and lights to
<br />control the movement of traffic where necessary. Placement of Mese devices shall
<br />be approved by the engineer prior to placement. Traffic control devices shall
<br />conform to the appropriate Minnesota deportment of Tronsportatian standards.
<br />5. In accordance with generally accepted construction proctices, the contractor will be
<br />solely ond completely responsible for conditions on the job site. including safety
<br />of on persons and property durklg the performance of the work. This requiremmt
<br />will apply continuously and not be limited lo normal working hours.
<br />6. The duty of the engineer or the developer to conduct construction reWew of the
<br />contractors perforrnonce M not intended to include review of the adequacy of the
<br />contractors safety measures M, or near the construction site.
<br />7. Before beginning construction the contractor sholl install o Temporary Rock Entrance
<br />pod at all points of vehicle exit from the project site. Said Rock Entronce pad
<br />shall be mointoined by the contractor for the durotion of the project. See detoils
<br />shown on Sheet C8-I of the project plans.
<br />8. Erosion ond Sedimentation control measures shalt be established around Inc entire
<br />site perimeter and 91 occordance with NPDES permit requirements. Best Management
<br />Practices, City requirements and the details shown on Sheet C8-1 01 the Project Pions.
<br />9. All entrances and connections to city streets shoe be performed per the requirements
<br />of the city. The controctor shall be responsible for all permits and notificotions as
<br />required by the city.
<br />10.
<br />See utility don and storm sewer profiles for further detail regarding the storm sewer.
<br />SAVE TREE
<br />SEE SHEET Lt-I
<br />r--
<br />CALL BEFORE YOU DIG.
<br />89
<br />RAN GARDEN
<br />L,
<br />!. ENE 444* .T,4 FEW
<br />==e TA ,Y-4
<br />ija Stt,
<br />589°58'266, 376.36
<br />.3
<br />Gopher State One Call
<br />TWIN CITY AREA: 651-454-0002
<br />TOLL MEE: 1-800-252-1166
<br />NORTH
<br />0 30
<br />60
<br />SCALE IN FEET
<br />1 rrOjeCt Name:
<br />VAUGHAN
<br />ADDITION
<br />Minnesota
<br />1 Owner/Developer Name:
<br />MIKE VAUGHAN
<br />600 Birch Street
<br />Lino Lakes, Minnesota
<br />1 Professional Services:
<br />LOUCKS
<br />ASSOCIATES
<br />Plximing • Civil Engineering • land Surveying
<br />landscape Archilechwe • Environmenvil
<br />•
<br />7200 Hemlock Lune- 5010 300
<br />Minneapolis. minnesota 59169
<br />Tele4l00ne=17631424-5505
<br />Fax= 17631424-5102
<br />www.lourkworiagon.co•
<br />=2004
<br />1 CADD Qualification:
<br />....Cf.
<br />,
<br />:so . se was on wsw w owns isc wow. swAss
<br />Mssclo■Tfloin:s
<br />tw saw= or mat ▪ samersw
<br />wowass mal pens srai sm..
<br />1 Submittal=
<br />10107100 PnikeinevCiis Approval
<br />IORSAM keviselPerCie Commis
<br />1 Professional Sienature:
<br />I Dewey may MN. pl. or
<br />onpared try rne uncle ...swamis* and.
<br />lain•eityLicomest ProlesWonal Eneswerwww,hewes
<br />&Me W. of Afirms..
<br />leikey Shopek -PE
<br />19624
<br />latenseNo.
<br />Osle
<br />Quality Control:
<br />‚ID
<br />KVR
<br />1 Sheet Index:
<br />C0-1 COVERNIEET
<br />C1-1 lICIDTINGCONDINONSPIAN
<br />C2-I 514( 4044
<br />C3-1 GRADING, 01tANAGE. ER05105 CONIROT
<br />C1-2 STORM WATER POLDMON PREVENTION PLAN
<br />04-0 ChISAll. UTILITY /IAN
<br />C6-1 PRCLIMINARYPLAT
<br />C8-1 0104094 0(800103 DETAILS
<br />U111.11YDETAILS
<br />1.1-1 TREF FRESERVATIONPtAN
<br />I Sheet Title:
<br />GRADING, DRAINAGE,
<br />AND EROSION CONTROL
<br />1 Project No.:
<br />04002
<br />1 55001 60.:
<br />C1-1
<br />•
<br />
|