Laserfiche WebLink
TKDA <br />•NGINEERS. ARCHITECTS • PLANNERS <br />MEMORANDUM <br />To: James Studenski, City Engineer Reference: Vaughan Addition <br />1500 Piper Jaffray Plaza <br />444 Cedar Street <br />Saint Paul, MN 55101 -2140 <br />(651) 292 -4400 <br />(651) 292 -0083 Fax <br />www.tkda.com <br />Copies To: City of Lino Lakes, Minnesota <br />From: Scott A. Brink, P.E. <br />Date: November 4, 2004 <br />Comm. No. 12976 -002 <br />Routing: <br />Plans have been submitted that provide for a single family residential development titled Vaughan Addition. <br />The proposed development essentially provides for the construction of 5 single family homes on 3 acres of <br />property. The property is located along the south side of Birch Street between Tomahawk Trail and West <br />Shadow Drive, or directly across Birch Street from Rice Lake Elementary School. Access to the 5 units <br />would be provided by the construction of a short cul -de -sac that would extend from Birch Street. <br />The following documents have been received for review: <br />• <br />Full size and half size plan sheets prepared by Loucks Associates received by the City of Lino Lakes <br />October 7, 2004 as follows: Boundary and Topographic Survey, Preliminary Plat, Cover Sheet (CO -1), <br />Existing Conditions (C1 -1), Site Plan (C2 -1), Grading, Drainage, and Erosion Control (C3 -1), <br />Stormwater Pollution Prevention Plan (C3 -2), Overall Utility Plan (C4 -0), Grading, Drainage, and <br />Erosion Details (C8 -1), and Utility Details (C9 -1) <br />2. Hydrologic Calculations, submitted by Loucks Associates and received by the City of Lino Lakes <br />October 7, 2004. <br />3. Revised copies of Sheets C1 -1, C2 -1, C3 -1, C3 -2, C4 -0 and the Preliminary Plat were also received by <br />the City of Lino Lakes on October 26, 2004. <br />The following comments are provided: <br />Grading, Drainage, and Drainage Calculations <br />1. The drainage calculations are acceptable based on the information provided. However, the calculations <br />are based on the assumption that all hard surface areas (including houses, driveways, and streets), will all <br />be directed to Pond 7P. This is possible only if all roof drains are discharged directly to the driveways at <br />the front of every house. If this is not possible, any drainage to the rear can be directed toward the pond <br />and/or the rain gardens which is acceptable. The only exception would be Lot 5 which does not directly <br />border a detention area. The amount of runoff to the rear of this property should be minimal and <br />• negligible. However, the developer shall be made aware that any grading and changes to the property as <br />it now exists will be noticed by adjoining properties. In particular, the property owner directly to the west <br />may be very sensitive with regards to grading and drainage adjacent to his property, and may request <br />An Employee Owned Company Promoting Affirmative Action and Equal Opportunity <br />