My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/09/2005 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2005
>
02/09/2005 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2014 1:29:42 PM
Creation date
6/18/2014 12:11:21 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
02/09/2005
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Turnberry Crossing Review <br />City of Lino Lakes, Minnesota <br />• <br />Page 4 January 31, 2005 <br />f) In addition to the requirements of the City of Lino Lakes, all utility work shall be performed in <br />accordance with the Standard Specifications of the City Engineers Association of Minnesota <br />(CEAM). Construction notes must be added to the utility sheets that include these requirements, <br />including minimum compaction standards for all utility trenches and roadway base. <br />g) <br />Water pipe and appurtenances shall meet the requirements of the City of Lino Lakes, and as <br />follows: Hydrants - Waterous Pacer WB -67; Valves - Mueller A2370 -20 or equal. DIP pipe shall <br />be Class 52. All sanitary sewer service pipes shall be SDR 26 or Schedule 40. Safety and traffic <br />control during construction must be provided in accordance with the State of Minnesota Manual <br />of Uniform Traffic Control Devices (MUTCD). <br />h) Catch basin/manhole castings for the swale /turf areas must be specified, subject to the approval of <br />the City of Lino Lakes. <br />i) The applicant shall be responsible for obtaining permits from the Minnesota Department of <br />Health and the Minnesota Pollution Control Agency for the water and sanitary sewer installations <br />as required. <br />j) <br />• <br />All restoration of existing streets shall be performed in accordance with the requirements of the <br />City of Lino Lakes. The City Street Superintendent must be notified at least 48 hours prior to any <br />street excavating or work of any manner on public streets and /or right of way. <br />
The URL can be used to link to this page
Your browser does not support the video tag.