Laserfiche WebLink
TKDA <br />ENGINEERS • ARCHITECTS • PLANNERS <br />• <br />• <br />MEMORANDUM <br />1500 Piper Jaffray Plaza <br />444 Cedar Street <br />Saint Paul, MN 55101 -2140 <br />(651) 292-4400 <br />(651) 292-0083 Fax <br />www.tkda.com <br />To: James E. Studenski, P.E. Reference: Molin Precast Manufacturing <br />City of Lino Lakes, Minnesota Engineering Review of <br />Copies To: Proposed Building Addition <br />From: Scott A. Brink, P.E. Comm. No. 13265.002 <br />Date: January 31, 2005 Routing: <br />A proposal to construct building addition improvements to the existing facility has been presented by Molin <br />Concrete. The following items have been submitted for review: <br />1. Full size Grading, Drainage, and Erosion Control Plans dated February 14, 2002 (existing <br />conditions). <br />2. Full size revised Site plan dated December 10, 2004 and received by the City of Lino Lakes January <br />14, 2005. <br />3. Letter from Molin Concrete dated January 11, 2005 outlining the proposed improvements. <br />4. Land Use Application dated January 5, 2005. <br />5. E -Mail dated January 10, 2005 from Molin Concrete. <br />6. Full -size and half -size Building Plans dated December 10, 2004, and received by the City of Lino <br />Lakes January 5, 2004. <br />The applicant proposes to construct a 17,500 square foot addition to the existing manufacturing facility. An <br />additional outside storage bay is also proposed. However, the location and size of the storage bay is not <br />easily definable on the plans submitted, and further detail is required. <br />Based upon our understanding of the amount of area to be disturbed (0.40 acres) for the building addition, it <br />would not appear that a review or approval of the Rice Creek Watershed District will be required. However, <br />a review may be warranted if the improvement site is located within a 100 -year flood plain, or within 1,000 <br />feet of a public water or protected wetland. It is therefore suggested that the applicant contact RCWD to <br />verify conformance in accordance with the Watershed's requirements. <br />The existing site conditions show a storm sewer near the location of the proposed addition. A revised and <br />proposed grading plan must be submitted that demonstrates how runoff from the new addition is proposed to <br />be routed, and include provisions and measures for sedimentation and erosion control. It is recommended <br />that existing drainage patterns be maintained and the capacities of existing storm sewers, ponds, etc. be <br />verified for their adequacies in accommodating additional runoff. <br />The applicant must verify the adequacy of existing utilities and plumbing to service the new addition, and <br />shall address per the building permit requirements of the City of Lino Lakes. <br />An Employee Owned Company Promoting Affirmative Action and Equal Opportunity <br />