My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/09/2005 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2005
>
02/09/2005 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2014 1:29:42 PM
Creation date
6/18/2014 12:11:21 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
02/09/2005
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- <br />11' -71/1 0 -7 0-7 <br />1 If <br />SV <br />7 A L PL <br />/ 1tuL PAIE1 <br />T.O. P. PAWL <br />WAS 54 <br />b <br />In <br />AT OWE <br />BEAM P <br />�+, <br />L0. iEE <br />T. PC PANEL <br />EL 17/ -r <br />4' , - <br />110. EFT 2EE <br />10' c 2 1/1 ■ <br />Ilk <br />EL 1 _ <br />g <br />w <br />..10' III <br />01241 <br />itoM1 <br />- <br />- <br />m ,i <br />ntr4/ <br />1,-10' CEE 44-1110.41 <br />.. <br />01m41 10' LEE -A <br />'ii. <br />,? <br />1 <br />v <br />11 <br />. <br />1 <br />1 <br />L <br />e ^ <br />\ <br />47%47 <br />I <br />-1 <br />2 <br />Q <br />m <br />124RI <br />24 <br />O41 <br />// <br />s13 <br />(ts` <br />Malt <br />10') <br />107 <br />(,mil <br />30'05 <br />R0. <br />I. <br />-- <br />fff <br />A <br />SPAY <br />Cr <br />I r <br />I <br />1 <br />I�— <br />1I <br />1 <br />I <br />I <br />I <br />I <br />I <br />I. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />t, <br />CRAZE <br />UV <br />7.42" <br />CS <br />R/ <br />12444 <br />b <br />16' <br />PRECAST <br />n.,.. ".]� <br />�. <br />I' <br />-- <br />9l <br />I? <br />��,1 <br />w <br />r <br />to <br />Y <br />n Cr <br />tT <br />Is <br />42 <br />T.0. 0.l <br />4 EL 130-Y <br />I <br />7-7 <br />1 1 <br />- <br />1 <br />7� —_I�- <br />1 I <br />a <br />T.O. Mil <br />I <br />I <br />_ <br />R.O. ' <br />W <br />I <br />'12444 N/ 115vIl1 <br />(1ffi� <br />VC) <br />I <br />7I <br />1 <br />■ <br />I I 1 <br />I <br />�4E <br />' 1 <br />1 <br />1 <br />7—�— <br />1 1 <br />C <br />I <br />7--- i- <br />1 1 <br />1 <br />I <br />I <br />E_ <br />I <br />„ <br />17.47 <br />za__ <br />R8113:110 (139-11 <br />© <br />5< <br />2 <br />e <br />io <br />F1AYA7d <br />PR1 E <br />lar <br />0 <br />A30 <br />V <br />Q <br />1 <br />AT <br />_; <br />CRAW <br />Ls <br />n ■ nau <br />i0. <br />54 <br />,as' <br />EL 7 <br />© <br />© <br />,V <br />t' -117 <br />© AGAW <br />IQ445 (134' -10') <br />254 <br />T0. P.0 PA1EL <br />1 <br />1 <br />I <br />I <br />I <br />I <br />a <br />© <br />25-0' <br />Y <br />. 25-0' 25-0' 254 <br />25-0' u -Y <br />175 -0' <br />ri' -lo• <br />0 16 <br />15 <br />14 <br />13 <br />12 <br />11 <br />10 9 <br />ROOF FRAMING PLAN <br />F -7 <br />700 OF fEE <br />SCALL 3/37 - 7-9 <br />1' <br />I <br />t 1 <br />I I <br />t <br />I <br />t <br />I <br />FRAMING ELEVATION <br />404 <br />4GA <br />310th 1/r - 1'-0• <br />KEYNOTES <br />0 ME la's 2 1/9 : 1401. BOLT TO P.0 0111111 AT 5-r 0.5 <br />IO 010.40 11/l7 r10'c3 /4' BASE 11,1,11 i/4- 1/7011.11 IIY 150 <br />ID UNE AIECEl01S <br />O FRAIE ARC1110 EPDSIPS i/ QF 10' a 2 1/9 c 1401. <br />, E ENED <br />JAN 0 5 2005 <br />CII3 ` F LINO LAKES <br />Professional <br />Design Group <br />Architects / Engineers <br />105 East Fourth Street <br />Suite 200 <br />PO Box 641 <br />Northfield, MN 55057 <br />Bus. (507) 645 -2298 <br />Fax. (507) 645 -2393 <br />www.profdesign.com <br />Project Title: <br />CONCRETE PRODUCTS COMPANY <br />Precast Manufacturing <br />Building Addition <br />Lino Lakes, Minnesota <br />Key Plan: <br />Revisions: <br />I I <br />1 I 12 -10 -04 I Drb <br />PRELIMINARY PRICING <br />key it I <br />Date I Approved By <br />Description <br />Note: <br />Drawings are not to be scaled to obtain <br />dimensions. Contoct Professional Design <br />Group for omitted or additional dimensions, <br />or those in conflict with actual field <br />measurements. <br />1 hereby certify that this plan, specification, or report <br />wos prepared by me or under my direct supervision <br />and that I am 0 duly Licensed Professional Engineer <br />under the lows of the state of Minnesota. <br />Signature' <br />Typed or Printed Nome <br />Dote: Reg No <br />Project Number. 97121.09 <br />Dote' 12 -10 -04 <br />Drown By- RAM <br />Checked By DFB <br />Copyright Professional Design Orn„n, 2004 <br />Sheet Title: <br />Roof Framing Plan <br />Sheet: <br />11' -71/1 0 -7 0-7 <br />1 If <br />17 -Y 7 <br />-31/♦t <br />1 <br />10 -111 /7 tr-S 1T- 1/T <br />0 <br />RP till lg <br />17 c 2 1/2' c <br />1$ -r <br />b <br />In <br />- -- <br />110. EFT 2EE <br />10' c 2 1/1 ■ <br />Ilk <br />..10' III <br />01241 <br />itoM1 <br />- <br />- <br />m ,i <br />ntr4/ <br />1,-10' CEE 44-1110.41 <br />.. <br />01m41 10' LEE -A <br />'ii. <br />,? <br />v <br />11 <br />. <br />1 <br />1 <br />L <br />FRAMING ELEVATION <br />404 <br />4GA <br />310th 1/r - 1'-0• <br />KEYNOTES <br />0 ME la's 2 1/9 : 1401. BOLT TO P.0 0111111 AT 5-r 0.5 <br />IO 010.40 11/l7 r10'c3 /4' BASE 11,1,11 i/4- 1/7011.11 IIY 150 <br />ID UNE AIECEl01S <br />O FRAIE ARC1110 EPDSIPS i/ QF 10' a 2 1/9 c 1401. <br />, E ENED <br />JAN 0 5 2005 <br />CII3 ` F LINO LAKES <br />Professional <br />Design Group <br />Architects / Engineers <br />105 East Fourth Street <br />Suite 200 <br />PO Box 641 <br />Northfield, MN 55057 <br />Bus. (507) 645 -2298 <br />Fax. (507) 645 -2393 <br />www.profdesign.com <br />Project Title: <br />CONCRETE PRODUCTS COMPANY <br />Precast Manufacturing <br />Building Addition <br />Lino Lakes, Minnesota <br />Key Plan: <br />Revisions: <br />I I <br />1 I 12 -10 -04 I Drb <br />PRELIMINARY PRICING <br />key it I <br />Date I Approved By <br />Description <br />Note: <br />Drawings are not to be scaled to obtain <br />dimensions. Contoct Professional Design <br />Group for omitted or additional dimensions, <br />or those in conflict with actual field <br />measurements. <br />1 hereby certify that this plan, specification, or report <br />wos prepared by me or under my direct supervision <br />and that I am 0 duly Licensed Professional Engineer <br />under the lows of the state of Minnesota. <br />Signature' <br />Typed or Printed Nome <br />Dote: Reg No <br />Project Number. 97121.09 <br />Dote' 12 -10 -04 <br />Drown By- RAM <br />Checked By DFB <br />Copyright Professional Design Orn„n, 2004 <br />Sheet Title: <br />Roof Framing Plan <br />Sheet: <br />
The URL can be used to link to this page
Your browser does not support the video tag.