Laserfiche WebLink
• <br />• <br />• <br />Marshan Lakeview /Funkhouser Estates <br />City of Lino Lakes, Minnesota <br />Page 3 January 21, 2005 <br />4) Because the utility main extensions will be owned and maintained by the City, as -built records will <br />be required upon completion. This includes plan and profile views of the sanitary sewer and <br />water. <br />5) The sanitary sewer and services must be placed a minimum distance from existing wells per <br />Minnesota Department of Health requirements. <br />6) Further construction details and standard plates of the City of Lino Lakes must be provided, including <br />gate valves, hydrant installations, and references to the Standard Utilities Specifications of the City <br />Engineers Association of Minnesota (CEAM). All sanitary sewer services shall be SCH 40 or SDR <br />26. <br />7) The applicant will be responsible for obtaining required permits for utility extensions from the <br />Minnesota Department of Health (MDH), the Minnesota Pollution Control Agency (MPCA), and <br />Metropolitan Council Environmental services (MCES). <br />Other Comments <br />1) The 30 foot street width and 60 foot wide right of ways as shown are acceptable. The right of way <br />has also been expanded as needed to encompass the existing trail easement. Underlying easements <br />and /or dedications no longer needed will require proper legal vacation or elimination by the applicant <br />as part of the platting process as required by the City and Anoka County. <br />2) A Tree Preservation plan has been provided, and shall be subject to further requirements as may be <br />provided by the City Forester. <br />3) The new street extension as shown does not conform directly to City standards. However, the street <br />width and pavement section essentially match the existing Marshan Lane, and are therefore <br />acceptable. Some bituminous curbing will be necessary to properly direct drainage to the runoff exit <br />location. Provisions must be also provided for maintaining an access and continuation of the existing <br />trail that runs toward City Hall. <br />4) The applicant shall be responsible for the verification of any existing well and septic locations on <br />both the subject property and adjoining properties to assure compliance with the State of Minnesota <br />requirements as previously expressed. <br />